Filter by category
Filter by Date
Update - Possible intervention to manage power system security in South Australia (SA) Region
Update - Possible intervention to manage power system security in South Australia (SA) Region
The combination of synchronous generating units currently expected to be synchronised in SA from 0030 hrs 06/06/2021 in Pre-dispatch will not provide sufficient system strength in SA to maintain the power system in a secure operating state.
In the absence of sufficient market response AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised from 0030 hrs 06/06/2021 to maintain power system security in SA. Refer to current Transfer Limit Advice for SA system strength on the AEMO website.
AEMO estimates the latest time at which AEMO would need to intervene is 1700 hrs on 05/06/2021.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 10/06/2021
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period[s]:
[1.] From 1930 hrs 10/06/2021 to 2000 hrs 10/06/2021.
The forecast capacity reserve requirement is 878 MW.
The minimum capacity reserve available is 869 MW.
Manager NEM Real Time Operations
Cancellation - AEMO Intervention Event - Intervention dispatch intervals - Direction SA region - 04/06/2021
Cancellation - AEMO Intervention Event - Intervention dispatch intervals - Direction SA region - 04/06/2021
Refer Market Notice 86607
The AEMO Intervention Event and all associated directions are cancelled from 1500 hrs 05/06/20211
Manager NEM Real Time Operations
[EventId:202106050825_NRM_QLD1_NSW1_stopped] NEGRES CONSTRAINT NRM_QLD1_NSW1 ceased operating from 05 June 2021 08:25
Issued by Australian Energy Market Operator Ltd at 0825 hrs on 5 June 2021
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 5 June 2021.
Refer to market notice: 86671
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the QLD to NSW directional interconnector.
The negative residue constraint NRM_QLD1_NSW1 ceased operating at 0825 hrs on 5 June 2021.
This is an AEMO autogenerated Market Notice.
[EventId:202106050710_NRM_QLD1_NSW1_started] NEGRES CONSTRAINT NRM_QLD1_NSW1 started operating from 05 June 2021 07:10
Issued by Australian Energy Market Operator Ltd at 0710 hrs on 5 June 2021
ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 5 June 2021.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the QLD to NSW directional interconnector.
The negative residue constraint set NRM_QLD1_NSW1 commenced operating from 0710 hrs on 5 June 2021.
This constraint set contains an equation with the following interconnectors on the LHS:
N-Q-MNSP1
NSW1-QLD1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202106050515_confirmed] Prices for interval 05-Jun-2021 05:15 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0535 hrs on 5 June 2021
PRICES ARE NOW CONFIRMED for dispatch interval 05-Jun-2021 05:15.
In accordance with Market Notice 86659 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202106050535_confirmed] Prices for interval 05-Jun-2021 05:35 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0535 hrs on 5 June 2021
PRICES ARE NOW CONFIRMED for dispatch interval 05-Jun-2021 05:35.
In accordance with Market Notice 86664 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202106050530_confirmed] Prices for interval 05-Jun-2021 05:30 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0535 hrs on 5 June 2021
PRICES ARE NOW CONFIRMED for dispatch interval 05-Jun-2021 05:30.
In accordance with Market Notice 86662 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202106050525_confirmed] Prices for interval 05-Jun-2021 05:25 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0535 hrs on 5 June 2021
PRICES ARE NOW CONFIRMED for dispatch interval 05-Jun-2021 05:25.
In accordance with Market Notice 86661 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.