Filter by category
Filter by Date
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 12/12/2021
AEMO ELECTRICITY MARKET NOTICE
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:
[1.] From 1830 hrs 12/12/2021 to 2030 hrs 12/12/2021.
The forecast capacity reserve requirement is 600 MW.
The minimum capacity reserve available is 519 MW.
Manager NEM Real Time Operations
NON-CONFORMANCE Region NSW1 Saturday, 11 December 2021
NON-CONFORMANCE NSW1 Region Saturday, 11 December 2021
AEMO declared a schedule generating unit non-conforming
Unit: GNNDHSF1
Duration: 11/12/2021 10:20 to 11/12/2021 10:25
Amount: 13 MW
Constraint: NC-N_GNNDHSF1
Auto-generated on behalf of Manager NEM Real Time Operations
NON-CONFORMANCE Region NSW1 Saturday, 11 December 2021
NON-CONFORMANCE NSW1 Region Saturday, 11 December 2021
AEMO declared a schedule generating unit non-conforming
Unit: VP6
Duration: 11/12/2021 05:40 to 11/12/2021 06:05
Amount: -13 MW
Constraint: NC-N_VP6
Auto-generated on behalf of Manager NEM Real Time Operations
Cancellation of a Non-Credible Contingency Event: Collinsville North - Proserpine No.7125 132 kV line and Collinsville North - Proserpine No.7126 132 kV line in QLD1 due to Lightning.
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: QLD1
Lines: Collinsville North - Proserpine No.7125 132 kV and Collinsville North - Proserpine No.7126 132 kV
Cancellation time: 10/12/2021 17:09
Constraint set(s) revoked:
NONE
Refer AEMO Electricity Market Notice 93115
Auto-generated on behalf of Manager NEM Real Time Operations
Direction - SA Region - 10/12/2021
Direction - SA Region - 10/12/2021
In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a).
The direction was necessary to maintain the power system in a secure operating state.
AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.
The issue of the direction commences an AEMO intervention event. AEMO declares all trading intervals during the event to be intervention trading intervals, commencing from the interval ending 1605 hrs on 10/12/2021.
Intervention pricing does not apply to this AEMO intervention event.
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Collinsville North - Proserpine No.7125 132 kV line and Collinsville North - Proserpine No.7126 132 kV line in QLD1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: QLD1
Lines: Collinsville North - Proserpine No.7125 132 kV and Collinsville North - Proserpine No.7126 132 kV
Duration: 10/12/2021 16:07 until further notice
Constraint set(s) invoked:
NONE
Auto-generated on behalf of Manager NEM Real Time Operations
Update - Possible intervention to manage power system security in South Australia (SA) Region
Update - Possible intervention to manage power system security in South Australia (SA) Region
Refer AEMO Electricity Market Notice 93108
The synchronous generating units currently expected to be synchronised in SA from 0400 hrs 11/12/2021 to 0400 hrs 12/12/2021 will be inadequate to maintain a secure operating state in SA.
AEMO estimates that, in the absence of sufficient market response by 1600 hrs 10/12/2021, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.
Manager NEM Real Time Operation
Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction SA region - 01/12/2021
Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction SA region - 01/12/2021
Refer Market Notice 92850
The AEMO Intervention Event and all associated directions are cancelled from 1645 hrs 10/12/2021
Manager NEM Real Time Operations
Update - Possible intervention to manage power system security in South Australia (SA) Region
Update - Possible intervention to manage power system security in South Australia (SA) Region
Refer AEMO Electricity Market Notice 93106
The synchronous generating units currently expected to be synchronised in SA from 0530 hrs 11/12/2021 to 0400 hrs 12/12/2021 will be inadequate to maintain a secure operating state in SA.
AEMO estimates that, in the absence of sufficient market response by 1600 hrs 10/12/2021, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.
Manager NEM Real Time Operation