Market Notices

107545MARKET SUSPENSION22/04/2023 04:17:38 PM

Declaration of electricity market suspension

AEMO ELECTRICITY MARKET NOTICE
Declaration of electricity market suspension
AEMO declares the spot market suspended in Victoria with Market Suspension Schedule Pricing (refer NER clause 3.14.5(b)) from Trading Interval 1620 hrs on 22 April 2023 until further notice.
Dispatch prices for the first one or two dispatch intervals of this market suspension will be reviewed manually.
Refer market notice 107544
Manager NEM Real Time Operation
107205CONSTRAINTS03/04/2023 01:42:00 PM

Tasmanian Regulation FCAS changes - Wednesday 5th April 2023

AEMO ELECTRICITY MARKET NOTICE

AEMO are changing the procurement of Regulation FCAS for the TAS region.

This change is based on advice received from TasNetworks, following a review of operation of the TAS region with the end of the reclassification of Basslink.

Refer to AEMO Electricity market notice 105443.

Following this change Regulation FCAS requirements for the TAS region will only be procured from within TAS.

This change will be implemented from 1000 on Wed 5th April.

Ben Blake
Manager Congestion & Grid Modelling
106855CONSTRAINTS21/03/2023 08:14:08 AM

Update to Victorian system normal constraint equations ID

AEMO ELECTRICITY MARKET NOTICE

AEMO has been conducting major review of thermal constraint equations for preparation of completion of VNI East project. As part of the review, AEMO is going to update the constraint equations IDs to use the new standard format of below (this is the same standard now used in NSW):

V>>[OUTAGE]_[MONITORING ELEMENT]_[CONTINGENCY ELEMENT]

This is to improve the simplicity and readability of a thermal constraint equation ID.

Constraint equations ID in sets V-NIL and V-NIL_BATS_BETS_15M will be updated to the new format on Thursday 23rd March 2023 at 1000 hrs. The previous used constraint equations ID will be included in the Modification field of the constraint equation for reference.

The changes have now been implemented into AEMO's pre-production system.

Terry Liu
AEMO Operations
106785MARKET SUSPENSION17/03/2023 08:42:02 PM

Declaration of electricity market resumption

AEMO ELECTRICITY MARKET NOTICE
Declaration of electricity market resumption

Refer initial AEMO Electricity Market Notice 106784

AEMO declares that the suspension of the spot market in New South Wales will end at 2110 hrs on 17 March 2023.

Failure of SCADA systems in NSW have been resolved.
Relevant Market Notices issued under this suspension:
106784
Manager NEM Real Time Operations
106784MARKET SUSPENSION17/03/2023 08:10:40 PM

Declaration of electricity market suspension

AEMO ELECTRICITY MARKET NOTICE
Declaration of electricity market suspension
AEMO declares the spot market suspended in New South Wales with Market Suspension Schedule Pricing (refer NER clause 3.14.5(b)) from Trading Interval 2015 hrs on 17 March 2023 until further notice.
Dispatch prices for the first one or two dispatch intervals of this market suspension will be reviewed manually.
AEMO has determined that it has become impossible to operate the spot market in accordance with the provisions of the Rules due to ? Failure of SCADA systems in NSW.
Manager NEM Real Time Operation
106643CONSTRAINTS15/03/2023 12:39:32 PM

Updated NSW system normal voltage stability limit

AEMO ELECTRICITY MARKET NOTICE

Refer to market notice 105936?

The Murraylink Very Fast Runback (VFRB) scheme was modified to increase the capacity of the network due to the increase in generation in the area. The scheme was changed so Murraylink VFRB could be activated / de-activated depending on the time of day on the monitored 220kV lines in north-west Victoria.?

Transgrid has advised AEMO on a revision to the X5 voltage collapse limit with this change to VFRB. This will now be managed by two limits.?

The following constraint equation changes will be implemented at 0900 hrs on Thursday 16th March 2023:
N^^N_NIL_X5_BEKG (replaces N^^N_NIL_3)
N^^N_NIL_X5_BESH (new)?

For full details on the factors on constraint equations and all the constraint equation changes - these have now been loaded into AEMO's pre-production systems.?

Ben Blake
AEMO Operations

106503RECALL GEN CAPACITY13/03/2023 10:42:16 AM

Request for Generator Recall Information for 16/03/2023 for NSW Region

AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Electricity Market Notice 106497.

Please provide Generator Recall Information for 16/03/2023 by 1100 hrs AEST on 14/03/2023 via the Generator Recall communication system, in accordance with clause 4.8.5A of the National Electricity Rules.

SO_OP_3719 Procedure for Submitting Generator Outage Recall Information is available at:
https://www.aemo.com.au/-/media/files/electricity/nem/security_and_reliability/power_system_ops/procedures/so_op_3719-procedure-for-submitting-recall-information-scheduled-generator-outages.pdf

Procedure on how to use Generator Recall in the EMMS Markets Portal is available at
http://www.aemo.com.au/-/media/Files/Electricity/NEM/IT-Systems-and-Change/2018/Guide-to-Generator-Recall-Plans.pdf

AEMO Operations
106502RECALL GEN CAPACITY13/03/2023 10:41:14 AM

Request for Generator Recall Information for 16/03/2023 for QLD Region

AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Electricity Market Notice 106498.

Please provide Generator Recall Information for 16/03/2023 by 1100 hrs AEST on 14/03/2023 via the Generator Recall communication system, in accordance with clause 4.8.5A of the National Electricity Rules.

SO_OP_3719 Procedure for Submitting Generator Outage Recall Information is available at:
https://www.aemo.com.au/-/media/files/electricity/nem/security_and_reliability/power_system_ops/procedures/so_op_3719-procedure-for-submitting-recall-information-scheduled-generator-outages.pdf

Procedure on how to use Generator Recall in the EMMS Markets Portal is available at
http://www.aemo.com.au/-/media/Files/Electricity/NEM/IT-Systems-and-Change/2018/Guide-to-Generator-Recall-Plans.pdf

AEMO Operations
106175CONSTRAINTS01/03/2023 11:54:17 AM

Update to system strength requirements in North Queensland

AEMO ELECTRICITY MARKET NOTICE

Refer to market notice 102074

AEMO and Powerlink are continuing to investigate system strength requirements in North Queensland.
Due to commissioning of Kaban wind farm in Far North Queensland, the system normal equations have been revised to include following combinations.

-If Stanwell >=2, Stanwell + Calllide >=3, Gladstone >= 1, Stanwell + Callide + Gladstone >= 7, Kareeya >=0, Haughton Syncon status = ON/OFF, North Queensland load >=250 MW,
Ross+FNQ load >=100 MW, limit Kaban Windfarm to 100% (with Haughton Syncon ON), 0% (with Haughton Syncon Syncon OFF) and no limit to other NQLD Plants.

A revision to the constraint equations will be implemented at 1400 hrs on Wednesday 1st March 2023.

The new combinations have now published in a limits advice document on AEMO's website. For more information refer to the new limits advice: https://www.aemo.com.au/energy-systems/electricity/national-electricity-market-nem/system-operations/congestion-information-resource/limits-advice

This advice contains all the combinations for Queensland for system normal cases. Additional information has been included in the limit advice to clarify the requirement to disconnect all inverters/turbines under certain system conditions.

The constraint equation in the Q-NIL set of the form below will be modified:

Q_NIL_STRGTH_XXXX
Q_NIL_STRGTH_XXXX_I


AEMO Operations
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm