Filter by category
Filter by Date
PDPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region beginning on 14/06/2022
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 97270 has been updated at 1230 hrs to the following:
[1.] From 1530 hrs 14/06/2022 to 1630 hrs 14/06/2022.
The forecast capacity reserve requirement is 487 MW.
The minimum capacity reserve available is 335 MW.
[2.] From 0000 hrs 15/06/2022 to 0100 hrs 15/06/2022.
The forecast capacity reserve requirement is 720 MW.
The minimum capacity reserve available is 78 MW.
[3.] From 0630 hrs 15/06/2022 to 0700 hrs 15/06/2022.
The forecast capacity reserve requirement is 720 MW.
The minimum capacity reserve available is 432 MW.
[4.] From 0800 hrs 15/06/2022 to 1100 hrs 15/06/2022.
The forecast capacity reserve requirement is 720 MW.
The minimum capacity reserve available is 30 MW.
[5.] From 1500 hrs 15/06/2022 to 1700 hrs 15/06/2022.
The forecast capacity reserve requirement is 720 MW.
The minimum capacity reserve available is 230 MW.
[6.] From 2230 hrs 15/06/2022 to 0300 hrs 16/06/2022.
The forecast capacity reserve requirement is 720 MW.
The minimum capacity reserve available is 74 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 16/06/2022
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following periods:
[1.] From 0730 hrs to 0800 hrs 16/06/2022.
The forecast capacity reserve requirement is 1384 MW.
The minimum capacity reserve available is 1304 MW.
[2.] From 2000 hrs to 2100 hrs 16/06/2022.
The forecast capacity reserve requirement is 1431 MW.
The minimum capacity reserve available is 1199 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region beginning on 14/06/2022
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 97249 has been updated at 1200 hrs to the following:
1. From 1530 hrs 14/06/2022 to 1630 hrs 14/06/2022.
The forecast capacity reserve requirement is 487 MW.
The minimum capacity reserve available is 297 MW.
2. From 0000 hrs 15/06/2022 to 0130 hrs 15/06/2022.
The forecast capacity reserve requirement is 720 MW.
The minimum capacity reserve available is 18 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region beginning on 14/06/2022
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 97214 has been updated at 1100 hrs to the following:
1. From 1600 hrs 14/06/2022 to 1700 hrs 14/06/2022.
The forecast capacity reserve requirement is 730 MW.
The minimum capacity reserve available is 579 MW.
2. From 0000 hrs 15/06/2022 to 0100 hrs 15/06/2022.
The forecast capacity reserve requirement is 703 MW.
The minimum capacity reserve available is 143 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 17/06/2022
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:
From 0800 hrs to 0900 hrs 17/06/2022.
The forecast capacity reserve requirement is 397 MW.
The minimum capacity reserve available is 298 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 15/06/2022
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following periods:
[1.] From 0630 hrs to 0930 hrs 15/06/2022.
The forecast capacity reserve requirement is 1164 MW.
The minimum capacity reserve available is 456 MW.
[2.] From 1630 hrs to 2300 hrs 15/06/2022.
The forecast capacity reserve requirement is 1184 MW.
The minimum capacity reserve available is 697 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 15/06/2022
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice no. 97106 has been updated at 1100 hrs on 14/06/2022 to the following:
From 0800 hrs to 0900 hrs 15/06/2022.
The forecast capacity reserve requirement is 584 MW.
The minimum capacity reserve available is 501 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region beginning on 14/06/2022
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 97175 has been updated at 1100 hrs to the following:
1. From 1530 hrs 14/06/2022 to 1630 hrs 14/06/2022.
The forecast capacity reserve requirement is 487 MW.
The minimum capacity reserve available is 162 MW.
2. From 0000 hrs 15/06/2022 to 0100 hrs 15/06/2022.
The forecast capacity reserve requirement is 720 MW.
The minimum capacity reserve available is 143MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 14/06/2022
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following periods:
[1.] From 0700 hrs 14/06/2022 to 0730 hrs 14/06/2022.
The forecast capacity reserve requirement is 730 MW.
The minimum capacity reserve available is 483 MW.
[2.] From 1700 hrs 14/06/2022 to 1730 hrs 14/06/2022.
The forecast capacity reserve requirement is 804 MW.
The minimum capacity reserve available is 315 MW.
[3.] From 2100 hrs 14/06/2022 to 2230 hrs 14/06/2022.
The forecast capacity reserve requirement is 863 MW.
The minimum capacity reserve available is 190 MW.
AEMO is seeking a market response.
AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0700 hrs on 14/06/2022
Manager NEM Real Time Operations