PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the QLD Region on 16/06/2022
The Forecast LOR3 condition in the QLD region advised in AEMO Electricity Market Notice No. 97876 has been updated at 2030 hrs to the following:
From 1700 hrs 16/06/2022 to 2230 hrs 16/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 246 MW at 1800 hrs.
AEMO is seeking a market response.
AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 1630 hrs on 16/06/2022.
AEMO Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the NSW Region beginning on 15/06/2022
The Forecast LOR3 condition in the NSW region advised in AEMO Electricity Market Notice No. 97822 has been updated at 1900 hrs to the following:
[1.] From 2000 hrs 15/06/2022 to 0400 hrs 16/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 989 MW at 2200 hrs.
[2.] From 0700 hrs 16/06/2022 to 1130 hrs 16/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 1490 MW at 0900 hrs.
[3.] From 1330 hrs 16/06/2022 to 0400 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 4073 MW at 2000 hrs.
AEMO is seeking a market response.
AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 1930 hrs on 15/06/2022.
AEMO Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the QLD Region beginning on 15/06/2022
The Forecast LOR3 condition in the QLD region advised in AEMO Electricity Market Notice No. 97840 has been updated at 1900 hrs to the following:
[1.] From 2000 hrs 15/06/2022 to 2030 hrs 15/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 247 MW at 2000 hrs.
[2.] From 2300 hrs 15/06/2022 to 2330 hrs 15/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 4 MW at 2300 hrs.
[3.] From 0700 hrs 16/06/2022 to 0730 hrs 16/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 208 MW at 0700 hrs.
[4.] From 1700 hrs 16/06/2022 to 2200 hrs 16/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 257 MW at 1800 hrs.
AEMO is seeking a market response.
AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 1930 hrs on 15/06/2022.
AEMO Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the VIC Region beginning on 16/06/2022
The Forecast LOR3 condition in the VIC region advised in AEMO Electricity Market Notice No. 97797 has been updated at 1830 hrs to the following:
[1.] From 0730 hrs 16/06/2022 to 1130 hrs 16/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 753 MW at 0930 hrs.
[2.] From 1330 hrs 16/06/2022 to 0400 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 2100 MW at 1830 hrs.
AEMO is seeking a market response.
AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0700 hrs on 16/06/2022.
AEMO Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the QLD Region beginning on 15/06/2022
The Forecast LOR3 condition in the QLD region advised in AEMO Electricity Market Notice No. 97817 has been updated at 1800 hrs to the following:
[1.] From 2000 hrs 15/06/2022 to 2030 hrs 15/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 401 MW at 2000 hrs.
[2.] From 2100 hrs 15/06/2022 to 2130 hrs 15/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 0 MW at 2100 hrs.
[3.] From 2300 hrs 15/06/2022 to 2330 hrs 15/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 1 MW at 2300 hrs.
[4.] From 0700 hrs 16/06/2022 to 0730 hrs 16/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 130 MW at 0700 hrs.
[5.] From 1700 hrs 16/06/2022 to 2200 hrs 16/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 217 MW at 1800 hrs.
AEMO is seeking a market response.
AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 1930 hrs on 15/06/2022.
AEMO Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the SA Region beginning on 16/06/2022
The Forecast LOR3 condition in the SA region advised in AEMO Electricity Market Notice No. 97807 has been updated at 1730 hrs to the following:
[1.] From 0800 hrs 16/06/2022 to 1130 hrs 16/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 757 MW at 0930 hrs.
[2.] From 1330 hrs 16/06/2022 to 0400 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 1867 MW at 2000 hrs.
AEMO is seeking a market response.
AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0730 hrs on 16/06/2022.
AEMO Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the NSW Region beginning on 15/06/2022
The Forecast LOR3 condition in the NSW region advised in AEMO Electricity Market Notice No. 97776 has been updated at 1700 hrs to the following:
[1.] From 2000 hrs 15/06/2022 to 0230 hrs 16/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 1197 MW at 2030 hrs.
[2.] From 0330 hrs 16/06/2022 to 0400 hrs 16/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 221 MW at 0330 hrs.
[3.] From 0700 hrs 16/06/2022 to 1130 hrs 16/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 1385 MW at 0900 hrs.
[4.] From 1330 hrs 16/06/2022 to 0400 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 4209 MW at 2000 hrs.
AEMO is seeking a market response.
AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 1930 hrs on 15/06/2022.
AEMO Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the QLD Region beginning on 15/06/2022
The Forecast LOR3 condition in the QLD region advised in AEMO Electricity Market Notice No. 97772 has been updated at 1700 hrs to the following:
[1.] From 2000 hrs 15/06/2022 to 2030 hrs 15/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 54 MW at 2000 hrs.
[2.] From 0700 hrs 16/06/2022 to 0730 hrs 16/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 244 MW at 0700 hrs.
[3.] From 1730 hrs 16/06/2022 to 2130 hrs 16/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 321 MW at 2000 hrs.
AEMO is seeking a market response.
AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 1930 hrs on 15/06/2022.
AEMO Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 3 (LOR3) in the SA Region beginning on 16/06/2022
The Forecast LOR3 condition in the SA region advised in AEMO Electricity Market Notice No. 97759 has been updated at 1630 hrs to the following:
[1.] From 0800 hrs 16/06/2022 to 1130 hrs 16/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 890 MW at 0930 hrs.
[2.] From 1330 hrs 16/06/2022 to 0400 hrs 17/06/2022.
The maximum load (other than interruptible loads) forecast to be interrupted is 1915 MW at 2000 hrs.
AEMO is seeking a market response.
AEMO estimates the latest time it would need to intervene through an AEMO intervention event is 0730 hrs on 16/06/2022.
AEMO Operations