91940RECLASSIFY CONTINGENCY25/10/2021 01:55:35 PM

Reclassification of a Non-Credible Contingency Event: Tarong - Chinchilla No.7168 132 kV line and Tarong - Chinchilla No.7183 132 kV line in QLD1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: QLD1

Lines: Tarong - Chinchilla No.7168 132 kV and Tarong - Chinchilla No.7183 132 kV

Duration: 25/10/2021 13:55 until further notice

Constraint set(s) invoked:
NONE

Auto-generated on behalf of Manager NEM Real Time Operations
91939RECLASSIFY CONTINGENCY25/10/2021 01:55:30 PM

Reclassification of a Non-Credible Contingency Event: Condabri Nth - Condabri Central 7400 132kV line and Condabri Nth - Condabri Central 7401 132kV line in QLD1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: QLD1

Lines: Condabri Nth - Condabri Central 7400 132kV and Condabri Nth - Condabri Central 7401 132kV

Duration: 25/10/2021 13:55 until further notice

Constraint set(s) invoked:
NONE

Auto-generated on behalf of Manager NEM Real Time Operations
91938RESERVE NOTICE25/10/2021 01:50:42 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region beginning on 27/10/2021.

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 91937 is cancelled at 1300 hrs 25/10/2021.

No LOR2 condition is currently forecast in the STPASA period.

AEMO Operations
91937RESERVE NOTICE25/10/2021 10:44:28 AM

STPASA - Update Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region beginning on 27/10/2021

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 conditions in the SA region advised in AEMO Electricity Market Notice No. 91936 has been updated at 1000 hrs 25/10/2021 to the following:

From 0600 hrs 28/10/2021 to 0700 hrs 28/10/2021.
The forecast capacity reserve requirement is 451 MW.
The minimum capacity reserve available is 449 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

The Forecast LOR2 condition on 27/10/2021 advised in AEMO Electricity Market Notice No. 91936 is cancelled at 1000 hrs 25/10/202.

AEMO Operations
91936RESERVE NOTICE25/10/2021 10:00:03 AM

STPASA - Update Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region beginning on 27/10/2021

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 conditions in the SA region advised in AEMO Electricity Market Notice No. 91935 has been updated at 0900 hrs 25/10/2021 to the following:

[1.] From 1800 hrs 27/10/2021 to 1900 hrs 27/10/2021.
The forecast capacity reserve requirement is 417 MW.
The minimum capacity reserve available is 239 MW.

[2.] From 0430 hrs 28/10/2021 to 0730 hrs 28/10/2021.
The forecast capacity reserve requirement is 425 MW.
The minimum capacity reserve available is 235 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
91935RESERVE NOTICE25/10/2021 08:07:31 AM

STPASA - Update Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region beginning on 27/10/2021

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 conditions in the SA region advised in AEMO Electricity Market Notice No. 91934 has been updated at 0700 hrs 25/10/2021 to the following:

[1.] From 1800 hrs 27/10/2021 to 1900 hrs 27/10/2021.
The forecast capacity reserve requirement is 459 MW.
The minimum capacity reserve available is 246 MW.

[2.] From 0530 hrs 28/10/2021 to 0700 hrs 28/10/2021.
The forecast capacity reserve requirement is 373 MW.
The minimum capacity reserve available is 233 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
91934RESERVE NOTICE25/10/2021 07:15:28 AM

STPASA - Update Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region beginning on 27/10/2021

AEMO ELECTRICITY MARKET NOTICE

Refer AEMO Market Notice 91932

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following periods:

[1.] From 1730 hrs 27/10/2021 to 1900 hrs 27/10/2021.
The forecast capacity reserve requirement is 485 MW.
The minimum capacity reserve available is 262 MW.

[2.] From 0530 hrs 28/10/2021 to 0600 hrs 28/10/2021.
The forecast capacity reserve requirement is 373 MW.
The minimum capacity reserve available is 284 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
91933INTER-REGIONAL TRANSFER24/10/2021 10:11:09 PM

Inter-regional transfer limit variation - Sydenham 500kV centre CB Moorabool 2 line South Morang 2 line- Vic region - 20/10/2020

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Sydenham 500kV centre CB Moorabool 2 line South Morang 2 line- Vic region - 20/10/2020

At 2156 hrs there was a short notice outage at Sydenham on 500kV centre CB Moorabool 2 line /South Morang 2 line.


The following constraint set(s) was invoked from 2205 hrs until further notice
V-SY_CB

This constraint set(s) contains equations with the following interconnectors on the LHS.

T-V-MNSP1
V-SA
V-S-MNSP1
VIC1- NSW1

Manager NEM Real Time Operations
91932RESERVE NOTICE24/10/2021 08:29:23 PM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 27/10/2021

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:

[1.] From 1830 hrs 27/10/2021 to 1900 hrs 27/10/2021.
The forecast capacity reserve requirement is 399 MW.
The minimum capacity reserve available is 360 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.