Market Notices

91997RECLASSIFY CONTINGENCY27/10/2021 10:54:26 PM

Reclassification of a Non-Credible Contingency Event: Para-Templers West and Magill-Torrens Island A 275kV lines in SA due to severe weather warning.

AEMO ELECTRICITY MARKET NOTICE.

Reclassification of a non-credible contingency event as a credible contingency event due to severe weather warning.

AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: SA

Lines: Para-Templers West and Magill-Torrens Island A 275kV lines

until further notice
Constraint set(s) invoked: Nil

Manager NEM Real Time Operations
91996RECLASSIFY CONTINGENCY27/10/2021 04:29:13 PM

Reclassification of a Non-Credible Contingency Event: Brinkworth-Davenport, Brinkworth-Templers West and Para-Templers West 275kV lines in SA due to severe weather warning.

AEMO ELECTRICITY MARKET NOTICE.

Reclassification of a non-credible contingency event as a credible contingency event due to severe weather warning.

AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: SA

Lines: Brinkworth-Davenport, Brinkworth-Templers West and Para-Templers West 275kV lines

Duration: 1630 hrs 27/10/2021 until further notice

Constraint set(s) invoked: Nil

Manager NEM Real Time Operations
91995MARKET INTERVENTION27/10/2021 04:03:24 PM

Direction - SA Region - 27/10/2021

AEMO ELECTRICITY MARKET NOTICE

Direction - SA Region - 27/10/2021

In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a).

The direction was necessary to maintain the power system in a secure operating state.

AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.

The issue of the direction commences an AEMO intervention event. AEMO declares all trading intervals during the event to be intervention trading intervals, commencing from the interval ending 1605 hrs on 27/10/2021.

Intervention pricing does not apply to this AEMO intervention event.

Manager NEM Real Time Operations
91991MARKET INTERVENTION27/10/2021 04:59:45 PM

Cancellation - AEMO Intervention Event - Intervention dispatch intervals - Direction SA region - 14/10/2021

AEMO ELECTRICITY MARKET NOTICE

Cancellation - AEMO Intervention Event - Intervention dispatch intervals - Direction SA region - 14/10/2021

Refer Market Notice 91709

The AEMO Intervention Event and all associated directions are cancelled from 1700 hrs 27/10/2021

Manager NEM Real Time Operations
91989MARKET INTERVENTION27/10/2021 02:02:50 PM

Possible intervention to manage power system security in South Australia (SA) Region

AEMO ELECTRICITY MARKET NOTICE

Possible intervention to manage power system security in South Australia (SA) Region

The synchronous generating units currently expected to be synchronised in SA from 2230 hrs 27/10/2021 to 0400 hrs 29/10/2021 will be inadequate to maintain sufficient system strength in SA and hence a secure operating state.

AEMO estimates that, in the absence of sufficient market response by 1600 hrs 27/10/2021, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.

Manager NEM Real Time Operations
91988POWER SYSTEM EVENTS27/10/2021 01:06:32 PM

Non-credible contingency event - VIC region - 27/10/2021

AEMO ELECTRICITY MARKET NOTICE.

Non-credible contingency event - Vic region - 27/10/2021

At 1226 hrs the Wodonga to Dederang 330 kV line opened at the Wodonga end only.

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.

AEMO will not reclassify this event as a credible contingency event.

At 1239 hrs the Wodonga to Dederang 330 kV line was returned to service.

Manager NEM Real Time Operations
91983RECLASSIFY CONTINGENCY27/10/2021 08:32:39 AM

Cancellation of the reclassification of a Non-Credible Contingency Event: Brinkworth-Davenport, Brinkworth-Templers West and Para-Templers West 275kV lines in SA due to severe weather warning.

AEMO ELECTRICITY MARKET NOTICE.

Cancellation of the reclassification of a non-credible contingency event as a credible contingency event due to severe weather warning.

AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any severe weather warning in the vicinity of the following lines. Accordingly, its classification has reverted to a non-credible contingency event.

Region: SA

Lines: Brinkworth-Davenport, Brinkworth-Templers West and Para-Templers West 275kV lines

Cancellation time: 0815 hrs 27/10/2021

Constraint set(s) revoked: Nil

Refer AEMO Electricity Market Notice 91981

Manager NEM Real Time Operations
91982MARKET SYSTEMS27/10/2021 07:45:38 AM

CHG0070801 | Completed | Pre-Production | MSATS Pre-Production Release

Change Number: CHG0070801
Notification issued to: Market Notice

Notification Type: Completed

Change Type: Normal
Service/Component: MSATS - Meter Data Management
Change Title: MSATS Pre-Production Release

Support Information: Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
91981RECLASSIFY CONTINGENCY27/10/2021 07:01:29 AM

Reclassification of a Non-Credible Contingency Event: Brinkworth-Davenport, Brinkworth-Templers West and Para-Templers West 275kV lines in SA due to severe weather warning.

AEMO ELECTRICITY MARKET NOTICE.

Reclassification of a non-credible contingency event as a credible contingency event due to severe weather warning.

AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: SA

Lines: Brinkworth-Davenport, Brinkworth-Templers West and Para-Templers West 275kV lines

Duration: 0700 hrs 27/10/2021 until further notice

Constraint set(s) invoked: Nil

Manager NEM Real Time Operations