90094POWER SYSTEM EVENTS31/08/2021 06:00:03 PM

Update - Non-credible contingency event - NSW Region - 31/08/2021

AEMO ELECTRICITY MARKET NOTICE.

Update - Non-credible contingency event - NSW Region - 31/08/2021

Refer AEMO Electricity Market Notice 90077

At 1140 hrs the Eraring main 500 kV bus tripped.

The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.

The Eraring main 500 kV bus was returned to service at 1745 hrs.

Manager NEM Real Time Operations
90093RESERVE NOTICE31/08/2021 04:35:00 PM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 07/09/2021

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 90092 has been updated at 1600 hrs 31/08/2021 to the following:

From 1830 hrs 07/09/2021 to 2130 hrs 07/09/2021.
The forecast capacity reserve requirement is 250 MW.
The minimum capacity reserve available is 79 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
90092RESERVE NOTICE31/08/2021 03:52:07 PM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 07/09/2021

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 90079 has been updated at 1500 hrs 31/08/2021 to the following:

From 1800 hrs 07/09/2021 to 2230 hrs 07/09/2021.
The forecast capacity reserve requirement is 250 MW.
The minimum capacity reserve available is 47 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
90089MARKET INTERVENTION31/08/2021 05:00:56 PM

Direction - SA Region - 31/08/2021

Direction - SA Region - 31/08/2021

In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a).

The direction was necessary to maintain the power system in a secure operating state.

AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.

The issue of the direction commences an AEMO intervention event. AEMO declares all dispatch intervals during the event to be intervention dispatch intervals, commencing from the interval ending 1705 hrs on 31/08/2021.

Intervention pricing does not apply to this AEMO intervention event.

Manager NEM Real Time Operations
90086MARKET INTERVENTION31/08/2021 03:09:52 PM

Possible intervention to manage power system security in South Australia (SA) Region

AEMO ELECTRICITY MARKET NOTICE

Possible intervention to manage power system security in South Australia (SA) Region

The synchronous generating units currently expected to be synchronised in SA from 0830 hrs 01/09/2021 to 0400 hrs 02/09/2021 will be inadequate to maintain sufficient system strength in SA and hence a secure operating state.

AEMO estimates that, in the absence of sufficient market response by 1700 hrs 31/08/2021, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.

Manager NEM Real Time Operation
90085RESERVE NOTICE31/08/2021 02:42:08 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region beginning on 07/09/2021

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following periods:

[1.] From 0700 hrs 07/09/2021 to 0800 hrs 07/09/2021.
The forecast capacity reserve requirement is 470 MW.
The minimum capacity reserve available is 439 MW.

[2.] From 1800 hrs 07/09/2021 to 1900 hrs 07/09/2021.
The forecast capacity reserve requirement is 470 MW.
The minimum capacity reserve available is 305 MW.

[3.] From 2000 hrs 07/09/2021 to 2300 hrs 07/09/2021.
The forecast capacity reserve requirement is 470 MW.
The minimum capacity reserve available is 271 MW.

[4.] From 2330 hrs 07/09/2021 to 0030 hrs 08/09/2021.
The forecast capacity reserve requirement is 470 MW.
The minimum capacity reserve available is 438 MW.

AEMO Operations
90084MARKET INTERVENTION31/08/2021 04:31:23 PM

Cancellation - AEMO Intervention Event - Intervention dispatch intervals - Direction SA region - 30/08/2021

AEMO ELECTRICITY MARKET NOTICE

Cancellation - AEMO Intervention Event - Intervention dispatch intervals - Direction SA region - 30/08/2021

Refer Market Notice 90028

The AEMO Intervention Event and all associated directions are cancelled from 1630 hrs 31/08/2021

Manager NEM Real Time Operations
90079RESERVE NOTICE31/08/2021 02:10:21 PM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 07/09/2021

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:

From 1900 hrs 07/09/2021 to 2000 hrs 07/09/2021.
The forecast capacity reserve requirement is 250 MW.
The minimum capacity reserve available is 245 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
90078CONSTRAINTS31/08/2021 02:07:47 PM

Update to system normal constraint equation in NSW for voltage collapse at Balranald

AEMO ELECTRICITY MARKET NOTICE

TransGrid and AEMO completed review of the X5 voltage collapse limit in south west NSW on 30/08/2021. Based on this review, the limit on pre-contingent flow on Balranald to Darlington Point (X5) 220 kV line is increased by 30MW.

The following constraint equation updated today 31/08/2021 at 07:00 .
N^^N_NIL_3

Mahsa Ahmadi
AEMO Operations