75793MARKET INTERVENTION23/05/2020 05:59

Direction - SA region - 23/05/2020

AEMO ELECTRICITY MARKET NOTICE.

In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a).

The direction was necessary to maintain the power system in a secure operating state.

AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.

The issue of the direction commences an AEMO intervention event. AEMO declares all dispatch intervals during the event to be intervention dispatch intervals, commencing from the interval ending 1805 hrs on 23/05/2020.

Intervention pricing does not apply to this AEMO intervention event.

Manager NEM Real Time Operations
75791MARKET INTERVENTION23/05/2020 04:30

Cancellation - AEMO Intervention Event - Intervention dispatch intervals - Direction SA region - 22/05/2020

AEMO ELECTRICITY MARKET NOTICE

Refer Market Notice 75787

The AEMO Intervention Event and all associated directions are cancelled from 1630 hrs 23/05/2020.

Manager NEM Real Time Operation
75789MARKET INTERVENTION23/05/2020 01:38

Possible intervention to manage power system security in South Australia (SA) Region

AEMO ELECTRICITY MARKET NOTICE

The synchronous generating units expected to be synchronised in SA from 0130 hrs 24/05/2020 to 1530 hrs 24/05/2020 in Pre-dispatch published at 1330 hrs 23/05/2020 are inadequate to maintain sufficient system strength in SA and hence a secure operating state.

AEMO currently estimates that, in the absence of sufficient market response by 1800 hrs 23/05/2020, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.

Manager NEM Real Time Operations
75788RECLASSIFY CONTINGENCY23/05/2020 09:15

Reclassification of a Non Credible Contingency Event: South East No.1 and No.2 275 kV SVCs.- SA region

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event. AEMO considers the simultaneous trip of the following equipment to now be more likely and reasonably possible. Accordingly, AEMO has reclassified it as a credible contingency event.

Region: SA1

Equipment: South East SVC 1 and SVC 2

Duration: 23/05/2020 08:50 until further notice

Constraint set(s) invoked: NONE

Manager NEM Real Time Operations
75787MARKET INTERVENTION22/05/2020 05:59

Direction - SA region - 22/05/2020

AEMO ELECTRICITY MARKET NOTICE.

Direction - SA region - 22/05/2020

In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a).

The direction was necessary to maintain the power system in a secure operating state.

AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.

The issue of the direction commences an AEMO intervention event. AEMO declares all dispatch intervals during the event to be intervention dispatch intervals, commencing from the interval ending 1805 hrs on 22/05/2020.

Intervention pricing does not apply to this AEMO intervention event.

Manager NEM Real Time Operations
75785MARKET INTERVENTION22/05/2020 03:15

Possible intervention to manage power system security in South Australia (SA) Region

AEMO ELECTRICITY MARKET NOTICE

Possible intervention to manage power system security in South Australia (SA) Region

The synchronous generating units expected to be synchronised in SA from 0300 hrs 23/05/2020 to 1700 hrs 23/05/2020 in Pre-dispatch published at 1500 hrs 22/05/2020 are inadequate to maintain sufficient system strength in SA and hence a secure operating state.

AEMO currently estimates that, in the absence of sufficient market response by 1800 hrs 22/05/2020, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.

Manager NEM Real Time Operations
75784CONSTRAINTS22/05/2020 11:26

New system normal constraint equation in Victoria for voltage collapse on trip of Ballarat - Waubra - Ararat line

AEMO ELECTRICITY MARKET NOTICE

In the event of a trip of the Ballarat - Waubra - Ararat 220 kV line the Ararat, Crowlands, Bulgana, Murra Warra and Waubra wind farms will be tripped off. AEMO has completed work on a revised voltage collapse limit for this contingency which will replace the existing 600 MW cap on these generators. FCAS constraint equations have also been developed for this contingency.

The energy constraint equation includes generators in south-west NSW and north-west Victoria on the left-hand side as well as VIC1-NSW1.

The following constraint equations will be implemented at 1000 hrs Monday 25th May 2020.
N^^V_NIL_ARWBBA
F_I+GFT_TG_R6
F_I+GFT_TG_R60
F_I+GFT_TG_R5
F_MAIN++GFT_TG_R6
F_MAIN++GFT_TG_R60
F_MAIN++GFT_TG_R5
F_MAIN+GFT_TG_R6
F_MAIN+GFT_TG_R60
F_MAIN+GFT_TG_R5

The following constraint equation will be removed:
V^V_NIL_ARWBBA

For further details on these new constraint equations please contact ben.blake@aemo.com.au

Ben Blake
AEMO Operations
75783GENERAL NOTICE21/05/2020 03:15

Planned outage of Tungkillo - Tailem Bend 275 kV line in the SA region on 25/05/2020

AEMO ELECTRICITY MARKET NOTICE

The Tungkillo - Tailem Bend 275 kV line in South Australia (SA) region is planned to be out of service from 0930 hrs to 1630 hrs on 25/05/2020.

During this outage, SA will remain connected to the rest of the NEM via the Tailem Bend - Cherry Gardens 275 kV line and the 132kV network.

A credible contingency event on the Tailem Bend - Cherry Gardens 275 kV line during this planned outage will sever the 275kV connections between Victoria and SA. If SA remains connected to Victoria via the 132kV network only, this will pose a system security issue.

If the above credible contingencies occurs, AEMO will take all necessary steps as outlined in Section 3.1 of SO_OP_3715 Power System Security Guideline to separate the 132kV network and therefore manage an orderly separation of SA from the rest of the NEM.



Michael Yang
AEMO Operations
75782INTER-REGIONAL TRANSFER21/05/2020 11:17

Planned outage of the Muswellbrook - Tamworth 88 330 kV line - NSW region

AEMO ELECTRICITY MARKET NOTICE.

The planned outage of the Muswellbrook - Tamworth 88 330 kV line has completed early.

The following constraint set was revoked at 1105 hrs 21/05/2020

N-MUTW_88

The constraint set contain equations with the following interconnectors on the LHS

NSW1-QLD1
N-Q_MNSP1
T-V-MNSP1

Refer AEMO Network Outage Schedule (NOS) for further details.

Manager NEM Real Time Operations