92009RESERVE NOTICE28/10/2021 05:48:58 PM

PDPASA - Actual Lack Of Reserve Level 1 (LOR1) in the QLD Region on 28/10/2021

PDPASA - Actual Lack Of Reserve Level 1 (LOR1) in the QLD Region on 28/10/2021

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 28/10/2021

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1730 hrs.

The Actual LOR1 condition is forecast to exist until 1830 hrs.

The forecast capacity reserve requirement is 1004 MW.
The minimum capacity reserve available is 602 MW.


Manager NEM Real Time Operations
92008RESERVE NOTICE28/10/2021 05:18:38 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 28/10/2021

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 28/10/2021

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:

[1.] From 1730 hrs 28/10/2021 to 1900 hrs 28/10/2021.
The forecast capacity reserve requirement is 1005 MW.
The minimum capacity reserve available is 586 MW.


Manager NEM Real Time Operations
92007RECLASSIFY CONTINGENCY28/10/2021 04:58:15 PM

Reclassification of a Non-Credible Contingency Event: Hazelwood - Rowville No.1 220kV line and Hazelwood - Rowville No.2 220kV line in VIC1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: VIC1

Lines: Hazelwood - Rowville No.1 220kV and Hazelwood - Rowville No.2 220kV

Duration: 28/10/2021 16:58 until further notice

Constraint set(s) invoked:
V-HWRO_R_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NONE


Auto-generated on behalf of Manager NEM Real Time Operations
92006NON-CONFORMANCE28/10/2021 02:55:16 PM

NON-CONFORMANCE Region SA1 Thursday, 28 October 2021

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE SA1 Region Thursday, 28 October 2021

AEMO declared a schedule generating unit non-conforming

Unit: BNGSF1
Duration: 28/10/2021 14:15 to 28/10/2021 14:55
Amount: 97 MW
Constraint: NC-S_BNGSF1

Auto-generated on behalf of Manager NEM Real Time Operations
92001GENERAL NOTICE28/10/2021 02:36:26 PM

Non-credible contingency event more likely to occur due to existence of abnormal condition/s - SA region.

AEMO ELECTRICITY MARKET NOTICE.

AEMO has identified that a non-credible contingency event is more likely to occur because of the existence of abnormal conditions namely severe weather in the SA region.

As at the time of this notice the criteria for reclassification of any non-credible contingency event have not been met, however there is a possibility of severe weather impacting multiple transmission elements in its vicinity.

Conditions can change rapidly and potentially impacted plant may change. Further notices will only be published to advise of any reclassification, or when the abnormal conditions have ceased to impact the likelihood of a non-credible event occurring.

Constraint set I-VS_250 invoked at 1440 hrs 28/10/2021 until further notice.

Manager NEM Real Time Operations
92000INTER-REGIONAL TRANSFER28/10/2021 11:07:01 AM

Inter-regional transfer limit variation - SA region - 28/10/2021

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - SA region - 28/10/2021

At 1005 hrs 28/10/2021 there was an unplanned outage of Robertstown - Tungkillo 275 kV Line.

Constraint set invoked: S-RBTU_BC-2CP

This constraint set contains equations with the following interconnectors on the LHS.
V-SA
V-S-MNSP1

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations
91999MARKET SYSTEMS28/10/2021 10:26:09 AM

CHG0070884 : MSATS Production Release

Change Number: CHG0070884

Notification issued to: Market Notice

Notification Type: Initial

Change Type: Normal

Service/ Component: MSATS - Consumer Administration and Transfer Solution(CATS)

Change Title: MSATS Production Release

Change Start Date & Time: 03/11/2021 17:30:00 AEST

Change End Date & Time: 04/11/2021 16:00:00 AEST

Outage Start Date & Time: 03/11/2021 17:30:00 AEST

Outage End Date & Time: 03/11/2021 19:30:00 AEST

Environment: Production

Participant Impact and Requirements:

Users will not be able to access MSATS during the outage period.

Meter data processing and RM reports will not be available during the outage period.

User Rights Management (URM) will continue to operate, however the administration screens will not be accessible.

MSATS B2B Transactions and B2B MSATS Screens will be unavailable during this outage

NMI Discovery will not be available during the outage period.

Support Information:

Report any impacts to the AEMO Information and Support Hub or call 1300 236 600.
Please refer to https://aemo.service-now.com/participantportal?d=pp_services_status for any planned/unplanned maintenance activities .

91998MARKET SYSTEMS28/10/2021 09:57:09 AM

CHG0070639 : MSATS Production Release : Completed

Change Number: CHG0070639

Notification issued to: Market Notice

Notification Type: Completed

Change Type: Normal

Service/Component: MSATS - Consumer Administration and Transfer Solution(CATS)

Change Title: MSATS Production Release

Support Information: Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
91997RECLASSIFY CONTINGENCY27/10/2021 10:54:26 PM

Reclassification of a Non-Credible Contingency Event: Para-Templers West and Magill-Torrens Island A 275kV lines in SA due to severe weather warning.

AEMO ELECTRICITY MARKET NOTICE.

Reclassification of a non-credible contingency event as a credible contingency event due to severe weather warning.

AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: SA

Lines: Para-Templers West and Magill-Torrens Island A 275kV lines

until further notice
Constraint set(s) invoked: Nil

Manager NEM Real Time Operations
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm