Filter by category
Filter by Date
Possible intervention to manage power system security in South Australia (SA) Region
Possible intervention to manage power system security in South Australia (SA) Region
The synchronous generating units expected to be synchronised in SA from 2300 hrs 22/06/2021 to 1700 hrs 23/06/2021 in Pre-dispatch published at 1430 hrs 22/06/2021 are inadequate to maintain sufficient system strength in SA and hence a secure operating state.
AEMO currently estimates that, in the absence of sufficient market response by 1700 hrs 22/06/2021, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 22/06/2021
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 87597 has been updated at 1145 hrs to the following:
From 1730 hrs 22/06/2021 to 1900 hrs 22/06/2021
The contingency forecast capacity reserve requirement is 1430 MW.
The minimum capacity reserve available is 1266 MW.
Manager NEM Real Time Operations
RESERVE NOTICE MT PASA PUBLICATION 22 June 2021
Please note that MTPASA informs the market of potential reliability issues to allow the market to respond in the first instance, potentially avoiding the need for any market intervention or direction from AEMO.
For further information, please refer to:
https://www.aemo.com.au/Electricity/National-Electricity-Market-NEM/Data/Market-Management-System-MMS/Projected-Assessment-of-System-Adequacy
This notice supersedes Market Notice 87204 published on 15th June 2021.
Background
As part of a broader process of implementing the reliability standard, AEMO runs the Medium Term Projected Assessment of System Adequacy (MTPASA) process weekly to forecast expected unserved energy levels over a two year period. If the expected annual unserved energy exceeds the maximum level specified by the Reliability Standard, a Low Reserve Condition is identified.
For more information about how AEMO implements the reliability standard, please view the Reliability Standard Implementation Guidelines (RSIG) available on AEMO's website at
https://www.aemo.com.au/Electricity/National-Electricity-Market-NEM/Planning-and-forecasting/Reliability-Standard-Implementation-Guidelines
Forecasting
AEMO
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 22/06/2021
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
From 1730 hrs 22/06/2021 to 1830 hrs 22/06/2021.
The forecast capacity reserve requirement is 1430 MW.
The minimum capacity reserve available is 1345 MW.
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Darling Downs Power Station in Queensland Region 22/06/2021
Reclassification of a Non-Credible Contingency Event: Darling Downs Power Station in Queensland Region 22/06/2021
Based on advice from the asset owner, AEMO has declared the simultaneous trip of all the generators at Darling Downs Power Station as a credible contingency event.
AEMO considers the simultaneous trip of those generators to now be more likely.
AEMO has reclassified this as a credible contingency event from 1000 hrs 22/06/2021 until further notice.
To manage power system security. Constraint set Q-DARLING_DOWNS_N-2 invoked from 1000 hrs until further notice.
Manager NEM Real Time Operations
[EventId:202106220710_confirmed] Prices for interval 22-Jun-2021 07:10 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0730 hrs on 22 June 2021
PRICES ARE NOW CONFIRMED for dispatch interval 22-Jun-2021 07:10.
In accordance with Market Notice 87585 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202106220730_confirmed] Prices for interval 22-Jun-2021 07:30 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0730 hrs on 22 June 2021
PRICES ARE NOW CONFIRMED for dispatch interval 22-Jun-2021 07:30.
In accordance with Market Notice 87589 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202106220725_confirmed] Prices for interval 22-Jun-2021 07:25 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0730 hrs on 22 June 2021
PRICES ARE NOW CONFIRMED for dispatch interval 22-Jun-2021 07:25.
In accordance with Market Notice 87588 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202106220720_confirmed] Prices for interval 22-Jun-2021 07:20 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0730 hrs on 22 June 2021
PRICES ARE NOW CONFIRMED for dispatch interval 22-Jun-2021 07:20.
In accordance with Market Notice 87587 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.