Market Notices

87945RECLASSIFY CONTINGENCY07/07/2021 07:03:25 PM

Reclassification of a Non-Credible Contingency Event: Hazelwood - Rowville No.1 220kV line and Hazelwood - Rowville No.2 220kV line in VIC1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: VIC1

Lines: Hazelwood - Rowville No.1 220kV and Hazelwood - Rowville No.2 220kV

Duration: 07/07/2021 19:03 until further notice

Constraint set(s) invoked:
V-HWRO_R_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NONE


Auto-generated on behalf of Manager NEM Real Time Operations
87944RESERVE NOTICE07/07/2021 07:04:22 PM

Cancellation of Actual (LOR1) condition in the NSW region - 07/07/2021

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the NSW region - 07/07/2021

The Actual LOR1 Condition in the NSW region advised in AEMO Electricity Market Notice No.87943 is cancelled at 1900 hrs 07/07/2021.

Manager NEM Real Time Operations
87943RESERVE NOTICE07/07/2021 05:40:16 PM

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 07/07/2021

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 07/07/2021

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1730 hrs.
The Actual LOR1 condition is forecast to exist until 1900 hrs.

The capacity reserve requirement is 1488 MW
The minimum capacity reserve available is 1255 MW

Manager NEM Real Time Operations
87942MARKET SYSTEMS07/07/2021 04:32:31 PM

CHG0065336: Catch-Up Patching - MSATS URM Pre-Production Server - Windows


Change Number: CHG0065336

Notification issued to: Market Notice

Notification Type: Initial

Change Type: Normal

Service/ Component: MSATS - User Rights Management

Change Title: Catch-Up Patching - URM Pre-Production Server - Windows

Change Start Date & Time: 09/07/2021 09:00:00 AEST

Change End Date & Time: 09/07/2021 18:00:00 AEST

Outage Start Date & Time: 09/07/2021 09:00:00 AEST

Outage End Date & Time: 09/07/2021 18:00:00 AEST

Change Description:

URM Pre-Production planned system maintenance activity.

Environment: Pre-Production

Participant Impact and Requirements:

Please be aware that during the outage window, access to URM Pre-Production system will be unavailable.

Support Information:
Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
87941MARKET INTERVENTION07/07/2021 04:31:25 PM

Direction - SA region 07/07/2021

AEMO ELECTRICITY MARKET NOTICE.

Direction - SA region 07/07/2021

In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a).

The direction was necessary to maintain the power system in a secure operating state.

AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.

The issue of the direction commences an AEMO intervention event. AEMO declares all dispatch intervals during the event to be intervention dispatch intervals, commencing from the interval ending 1635 hrs on 07/07/2021.

Intervention pricing does not apply to this AEMO intervention event.

Manager NEM Real Time Operations
87939MARKET INTERVENTION07/07/2021 03:56:06 PM

Possible intervention to manage power system security in South Australia (SA) Region

AEMO ELECTRICITY MARKET NOTICE

Possible intervention to manage power system security in South Australia (SA) Region

The synchronous generating units currently expected to be synchronised in SA from 2330 hrs 07/07/2021 to 0630 hrs 08/07/2021 will be inadequate to maintain sufficient system strength in SA and hence a secure operating state.

AEMO estimates that, in the absence of sufficient market response by 1630 hrs 07/07/2021, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.

Manager NEM Real Time Operations
87938RESERVE NOTICE07/07/2021 03:45:36 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 07/07/2021

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:

From 1730 hrs to 1900 hrs 07/07/2021
The contingency forecast capacity reserve requirement is 1499 MW.
The minimum capacity reserve available is 1386 MW.

Manager NEM Real Time Operations
87937NON-CONFORMANCE07/07/2021 08:40:16 AM

NON-CONFORMANCE Region NSW1 Wednesday, 7 July 2021

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE NSW1 Region Wednesday, 7 July 2021

AEMO declared a schedule generating unit non-conforming

Unit: VP6
Duration: 07/07/2021 08:15 to 07/07/2021 08:40
Amount: -20 MW
Constraint: NC-N_VP6

Auto-generated on behalf of Manager NEM Real Time Operations
87936RESERVE NOTICE07/07/2021 08:09:57 AM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 07/07/2021

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 87935 is cancelled at 0800 hrs 07/07/2021.

Manager NEM Real Time Operations
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm