87983PRICES SUBJECT TO REVIEW11/07/2021 01:35:17 AM

[EventId:202107110140_review] Prices for interval 11-Jul-2021 01:40 are subject to review

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0135 hrs on 11 July 2021

PRICES ARE SUBJECT TO REVIEW for dispatch interval 11-Jul-2021 01:40.

AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs


This is an AEMO autogenerated Market Notice.
87982PRICES SUBJECT TO REVIEW11/07/2021 01:30:15 AM

[EventId:202107110135_review] Prices for interval 11-Jul-2021 01:35 are subject to review

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0130 hrs on 11 July 2021

PRICES ARE SUBJECT TO REVIEW for dispatch interval 11-Jul-2021 01:35.

AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs


This is an AEMO autogenerated Market Notice.
87981MARKET INTERVENTION10/07/2021 06:00:23 PM

Direction - SA Region 10/07/2021

AEMO ELECTRICITY MARKET NOTICE.

Direction - SA Region 10/07/2021

In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a).

The direction was necessary to maintain the power system in a secure operating state.

AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.

The issue of the direction commences an AEMO intervention event. AEMO declares all dispatch intervals during the event to be intervention dispatch intervals, commencing from the interval ending 1805 hrs on 10/07/2021.

Intervention pricing does not apply to this AEMO intervention event.

Manager NEM Real Time Operations
87978RESERVE NOTICE10/07/2021 02:21:22 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 12/07/2021

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 87976 is cancelled at 1415 hrs 10/07/2021.

[No LOR2 condition is currently forecast in the STPASA period.]

Manger NE Real Time Operations
87977MARKET INTERVENTION10/07/2021 01:15:52 PM

Possible intervention to manage power system security in South Australia (SA) Region

AEMO ELECTRICITY MARKET NOTICE

Possible intervention to manage power system security in South Australia (SA) Region

The synchronous generating units currently expected to be synchronised in SA from 0030 hrs 11/07/2021 to 1630 hrs 11/07/2021 will be inadequate to maintain sufficient system strength in SA and hence a secure operating state.

AEMO estimates that, in the absence of sufficient market response by 1700 hrs 10/07/2021 , AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.

Manager NEM Real Time Operations
87976RESERVE NOTICE10/07/2021 09:26:18 AM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 12/07/2021

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period[s]:

[1.] From 0730 hrs 12/07 to 0830 hrs 12/07.
The forecast capacity reserve requirement is 1667 MW.
The minimum capacity reserve available is 1473 MW.


AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.


Manager NEM Real Time Operations
87975NON-CONFORMANCE10/07/2021 09:00:11 AM

NON-CONFORMANCE Region NSW1 Saturday, 10 July 2021

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE NSW1 Region Saturday, 10 July 2021

AEMO declared a schedule generating unit non-conforming

Unit: VP6
Duration: 10/07/2021 08:50 to 10/07/2021 09:00
Amount: 38 MW
Constraint: NC-N_VP6

Auto-generated on behalf of Manager NEM Real Time Operations
87974NON-CONFORMANCE10/07/2021 04:50:16 AM

NON-CONFORMANCE Region SA1 Saturday, 10 July 2021

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE SA1 Region Saturday, 10 July 2021

AEMO declared a schedule generating unit non-conforming

Unit: OSB-AG
Duration: 10/07/2021 04:40 to 10/07/2021 04:50
Amount: 12 MW
Constraint: NC-S_OSB-AG

Auto-generated on behalf of Manager NEM Real Time Operations
87973GENERAL NOTICE09/07/2021 05:14:01 PM

Planned outage of Heywood 500kV bus no 2 outage in Victoria (VIC) region on 14, 21,22,23 July 2021

AEMO ELECTRICITY MARKET NOTICE

This market notice is FOR INFORMATION ONLY.

Heywood 500kV bus no 2 outages is planned to be out on the following periods.

-0700 hrs to 1700 hrs on 14 July 2021
-0700 hrs to 1700 hrs on 21 July 2021
-0700 hrs to 1700 hrs on 22 July 2021
-0700 hrs to 1700 hrs on 23 July 2021

A credible contingency event during this planned outage could cause synchronous separation of the South Australia (SA) region from the rest of the NEM. If separation occurs, load may be interrupted due to the operation of the Automatic Under Frequency Load Shedding (AUFLS) scheme in SA.

The credible separation contingency is managed as follows:

When power transfer is from SA to Victoria (Vic), contingency lower FCAS will be sourced from SA.
When power transfer is from Vic to SA, due to the 47-52Hz island separation frequency band advised by the SA jurisdiction, contingency raise FCAS is not sourced in SA and the AUFLS scheme may respond to low frequency events.
Power transfer will be restricted on Victoria - South Australia interconnector (Heywood interconnector).

Forecast capacity reserves in the SA region are currently sufficient to meet electricity demand during the planned outage.

The following constraint sets have been invoked for this outage:

F-I-HYSE
I-VS_050
S-X_BC_CP
V-HYTX_M12
V-HY_500BUS

Refer AEMO Network Outage Schedule (NOS) for further details.