Market Notices

53576RESERVE NOTICE01/06/2016 07:43:49 AM

Cancellation of the Forecast (LOR1) condition in the Tasmania region - PDPASA - 01/06/2016

AEMO ELECTRICITY MARKET NOTICE

Cancellation of the Forecast (LOR1) condition in the Tasmania region - PDPASA - 01/06/2016

The Forecast LOR1 condition in the Tasmania Region advised in AEMO Electricity Market Notices No. 53574 and 53575 is cancelled at 0741hrs 01/06/2016.


Manager NEM Real Time Operations
53575RESERVE NOTICE01/06/2016 06:00:29 AM

Update - Forecast Lack Of Reserve Level 1 (LOR1) in the Tasmania Region - PDPASA - 1 June 2016

AEMO ELECTRICITY MARKET NOTICE
Update to Market Notice 53574
Forecast Lack Of Reserve Level 1 (LOR1) in the Tasmania Region - PDPASA - 1 June 2016
AEMO declares a Forecast LOR1 condition for the Tasmania Region.
From 0700 hrs to 0930 hrs 01/06/16
The contingency capacity reserve required is 263 MW
The minimum reserve available is 190 MW

Manager NEM Real Time Operations
53574RESERVE NOTICE01/06/2016 01:46:03 AM

orecast Lack Of Reserve Level 1 (LOR1) in the Tasmania Region - PDPASA - 1 June 2016

AEMO ELECTRICITY MARKET NOTICE

Forecast Lack Of Reserve Level 1 (LOR1) in the Tasmania Region - PDPASA - 1 June 2016
AEMO declares a Forecast LOR1 condition for the Tasmania Region.
From 0730 hrs to 0830 hrs 01/06/16
The contingency capacity reserve required is 263MW
The minimum reserve available is 254 MW

Manager NEM Real Time Operations
53573NON-CONFORMANCE31/05/2016 05:55:12 PM

NON-CONFORMANCE Region QLD1 Tuesday, 31 May 2016

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE QLD1 Region Tuesday, 31 May 2016

AEMO declared a schedule generating unit non-conforming

Unit: BRAEMAR3
Duration: 31/05/2016 17:45 to 31/05/2016 17:55
Amount: 9 MW
Constraint: NC-Q_BRAEMAR3

Auto-generated on behalf of Manager NEM Real Time Operations
53572NON-CONFORMANCE31/05/2016 04:05:09 PM

NON-CONFORMANCE Region VIC1 Tuesday, 31 May 2016

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE VIC1 Region Tuesday, 31 May 2016

AEMO declared a schedule generating unit non-conforming

Unit: HWPS7
Duration: 31/05/2016 16:00 to 31/05/2016 16:05
Amount: -54 MW
Constraint: NC-V_HWPS7

Auto-generated on behalf of Manager NEM Real Time Operations
53571RESERVE NOTICE31/05/2016 02:16:01 PM

RESERVE NOTICE MT PASA PUBLICATION 31 MAY 2016

AEMO ELECTRICITY MARKET NOTICE

The MT PASA RELIABILITY_LRC results published on 31 May 2016 forecast shows low reserve conditions (LRC) in South Australia for Summer 2016-17 and Summer 2017-18. AEMO will continue to monitor the situation and take appropriate actions, if necessary.

The MT PASA results for the next 12 months are summarised at:
http://www.aemo.com.au/Electricity/Data/Forecast-Supply-and-Demand/Medium-Term-Outlook

This notice supersedes Market Notice 53514 published on 24 May 2016.

Please find the following information on some key inputs used in MT PASA:

Static minimum reserve levels (MRLs) have been specified for QLD, NSW and TAS regions as follows:

QLD: 913 MW
NSW: -1564 MW
TAS: 144 MW

The following optimum shared minimum reserve levels between Victoria and South Australia regions have been specified:

VIC Reserve >= 205.00
5.88 * VIC Reserve + SA Reserve >= 1237.88
1.33 * VIC Reserve + SA Reserve >= 228.00
0.43 * VIC Reserve + SA Reserve >= -40.53
0.23 * VIC Reserve + SA Reserve >= -147.55
SA Reserve >= -368.00

In order to remain consistent with the calculation of the minimum reserve levels, the following interconnector headroom constraints (net import/export limit constraints) have also been applied in MT PASA:

QLD: 0 MW of maximum net import into QLD.
NSW: 330 MW of minimum net export from NSW.
VIC: 940MW of maximum net import into VIC.
SA: 0 MW of maximum net import into SA.

Demand Side Participation included in MT PASA are:

Summer: QLD 156 MW, NSW 422 MW, VIC 245 MW, SA 167 MW and TAS 73 MW

Winter: QLD 156 MW, NSW 422 MW, VIC 185 MW, SA 167 MW and TAS 73 MW

Supply Planning
AEMO
53570NON-CONFORMANCE31/05/2016 11:55:12 AM

NON-CONFORMANCE Region NSW1 Tuesday, 31 May 2016

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE NSW1 Region Tuesday, 31 May 2016

AEMO declared a schedule generating unit non-conforming

Unit: MP2
Duration: 31/05/2016 11:40 to 31/05/2016 11:55
Amount: -31 MW
Constraint: NC-N_MP2

Auto-generated on behalf of Manager NEM Real Time Operations
53569NON-CONFORMANCE31/05/2016 07:45:22 AM

NON-CONFORMANCE Region QLD1 Tuesday, 31 May 2016

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE QLD1 Region Tuesday, 31 May 2016

AEMO declared a schedule generating unit non-conforming

Unit: BRAEMAR2
Duration: 31/05/2016 07:30 to 31/05/2016 07:45
Amount: -13 MW
Constraint: NC-Q_BRAEMAR2

Auto-generated on behalf of Manager NEM Real Time Operations
53568NON-CONFORMANCE31/05/2016 07:45:09 AM

NON-CONFORMANCE Region QLD1 Tuesday, 31 May 2016

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE QLD1 Region Tuesday, 31 May 2016

AEMO declared a schedule generating unit non-conforming

Unit: BRAEMAR1
Duration: 31/05/2016 07:15 to 31/05/2016 07:45
Amount: -13 MW
Constraint: NC-Q_BRAEMAR1

Auto-generated on behalf of Manager NEM Real Time Operations
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm