Filter by category
Filter by Date
Reclassification of a Non-Credible Contingency Event: Brinkworth-Davenport, Brinkworth-Templers West and Para-Templers West 275kV lines in SA due to severe weather warning.
Reclassification of a non-credible contingency event as a credible contingency event due to severe weather warning.
AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: SA
Lines: Brinkworth-Davenport, Brinkworth-Templers West and Para-Templers West 275kV lines
Duration: 1040 hrs 23/06/2021 until further notice
Constraint set(s) invoked: Nil
Manager NEM Real Time Operations
CHG0064164 : Implement trading restriction between related entities for Trayport in the GSH system
Notification issued to: Market Notice
Notification Type: Initial
Change Type: Normal
Service/ Component: Gas Supply Hub
Change Title: Implement trading restriction between related entities for Trayport in the GSH system
Change Start Date & Time: 24/06/2021 19:00:00 AEST
Change End Date & Time: 24/06/2021 22:00:00 AEST
Outage Start Date & Time: 24/06/2021 19:00:00 AEST
Outage End Date & Time: 24/06/2021 22:00:00 AEST
Change Description:
Preproduction Gas Supply Hub system (Trayport interface) will experience brief outages during the outage window due to planned maintenance.
Environment: Production
Participant Impact and Requirements:
Brief outages during the outage window due to planned maintenance.
Support Information:
Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
Update: Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 22/06/2021
Update: Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 22/06/2021
Refer Market notice 87604
An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1700 hrs.
The Actual LOR1 condition is now forecast to exist until 2000 hrs.
The capacity reserve requirement is 1400 MW
The minimum capacity reserve available is 935 MW
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the NSW region - 22/06/2021
AEMO ELECTRICITY MARKET NOTICE
Cancellation of Actual (LOR1) condition in the NSW region - 22/06/2021
The Actual LOR1 Condition in the NSW region advised in AEMO Electricity Market Notice No.87606 is cancelled at 1940 hrs 22/06/2021.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 22/06/2021
Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 22/06/2021
An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1730 hrs.
The Actual LOR1 condition is forecast to exist until 1830 hrs.
The capacity reserve requirement is 1400 MW
The minimum capacity reserve available is 1361 MW
Manager NEM Real Time Operations
Direction - SA region 22/06/2021
Direction - SA region 22/06/2021
In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a).
The direction was necessary to maintain the power system in a secure operating state.
AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.
The issue of the direction commences an AEMO intervention event. AEMO declares all dispatch intervals during the event to be intervention dispatch intervals, commencing from the interval ending 1705 hrs on 22/06/2021.
Intervention pricing does not apply to this AEMO intervention event.
Manager NEM Real Time Operations
Possible intervention to manage power system security in South Australia (SA) Region
Possible intervention to manage power system security in South Australia (SA) Region
The synchronous generating units expected to be synchronised in SA from 2300 hrs 22/06/2021 to 1700 hrs 23/06/2021 in Pre-dispatch published at 1430 hrs 22/06/2021 are inadequate to maintain sufficient system strength in SA and hence a secure operating state.
AEMO currently estimates that, in the absence of sufficient market response by 1700 hrs 22/06/2021, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 22/06/2021
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 87597 has been updated at 1145 hrs to the following:
From 1730 hrs 22/06/2021 to 1900 hrs 22/06/2021
The contingency forecast capacity reserve requirement is 1430 MW.
The minimum capacity reserve available is 1266 MW.
Manager NEM Real Time Operations
RESERVE NOTICE MT PASA PUBLICATION 22 June 2021
Please note that MTPASA informs the market of potential reliability issues to allow the market to respond in the first instance, potentially avoiding the need for any market intervention or direction from AEMO.
For further information, please refer to:
https://www.aemo.com.au/Electricity/National-Electricity-Market-NEM/Data/Market-Management-System-MMS/Projected-Assessment-of-System-Adequacy
This notice supersedes Market Notice 87204 published on 15th June 2021.
Background
As part of a broader process of implementing the reliability standard, AEMO runs the Medium Term Projected Assessment of System Adequacy (MTPASA) process weekly to forecast expected unserved energy levels over a two year period. If the expected annual unserved energy exceeds the maximum level specified by the Reliability Standard, a Low Reserve Condition is identified.
For more information about how AEMO implements the reliability standard, please view the Reliability Standard Implementation Guidelines (RSIG) available on AEMO's website at
https://www.aemo.com.au/Electricity/National-Electricity-Market-NEM/Planning-and-forecasting/Reliability-Standard-Implementation-Guidelines
Forecasting
AEMO