60853RESERVE NOTICE19/01/2018 03:42:16 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the VIC Region on 19/01/2018

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the VIC region advised in AEMO Electricity Market Notice No. 60845 is cancelled at 1530 hrs 19/01/2018.

No LOR2 condition is currently forecast in the PDPASA period.

Manager NEM Real Time Operations
60846RESERVE NOTICE19/01/2018 01:49:03 PM

PDPASA - Update of the Forecast Lack of Reserve Level 2 (LOR2) in the SA Region on 19/01/2018

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 60838 has been updated at 1130 hrs 19/01/2018 to the following:

From 1500 hrs to 1630 hrs on 19/01/2018

The contingency capacity reserve required is 350 MW.

The minimum reserve available is 32 MW.

AEMO is seeking a market response.

AEMO determines the latest time at which they would need to intervene through an AEMO intervention event is 1400 hrs on 19/01/2018

Manager NEM Real Time Operations
60845RESERVE NOTICE19/01/2018 01:48:45 PM

PDPASA - Update of the Forecast Lack of Reserve Level 2 (LOR2) in the VIC Region on 19/01/2018

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the VIC region advised in AEMO Electricity Market Notice No. 60837 has been updated at 1330 hrs 19/01/2018 to the following:

From 1430 hrs to 1700 hrs on 19/01/2018

The contingency capacity reserve required is 560 MW.
The minimum reserve available is 32 MW.

AEMO is seeking a market response.

AEMO determines the latest time at which they would need to intervene through an AEMO intervention event is 1400 hrs on 19/01/2018

Manager NEM Real Time Operations
60838RESERVE NOTICE19/01/2018 11:09:48 AM

PDPASA - Update of the Forecast Lack of Reserve Level 2 (LOR2) in the SA Region on 19/01/2018


AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 60834 has been updated at 1100 hrs 19/01/2018 to the following:

From 1430 hrs to 1630 hrs on 19/01/2018



The contingency capacity reserve required is 350 MW.

The minimum reserve available is 157 MW.

AEMO is seeking a market response.

AEMO determines the latest time at which they would need to intervene through an AEMO intervention event is 1200 hrs on 19/01/2018

Manager NEM Real Time Operations
60837RESERVE NOTICE19/01/2018 11:10:10 AM

PDPASA - Update of the Forecast Lack of Reserve Level 2 (LOR2) in the VIC Region on 19/01/2018


AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the VIC region advised in AEMO Electricity Market Notice No. 60833 has been updated at 1100 hrs 19/01/2018 to the following:

From 1430 hrs to 1700 hrs on 19/01/2018

The contingency capacity reserve required is 560 MW.
The minimum reserve available is 157 MW.

AEMO is seeking a market response.

AEMO determines the latest time at which they would need to intervene through an AEMO intervention event is 1200 hrs on 19/01/2018

Manager NEM Real Time Operations
60834RESERVE NOTICE19/01/2018 08:27:34 AM

PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region Friday 19th January 2018

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(c) of the National Electricity Rules for the SA region for the following period:

From 1530 hrs 19/01/2018 to 1600 hrs on 19/01/2018.
The contingency capacity reserve required is 350 MW.
The minimum reserve available is 287 MW.
AEMO is seeking a market response.
AEMO will determine the latest time at which they would need to intervene through an AEMO intervention event

Manager NEM Real Time Operations


60833RESERVE NOTICE19/01/2018 08:27:43 AM

PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the VIC Region Friday 19th January 2018


AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(c) of the National Electricity Rules for the VIC region for the following period:

From 1400 hrs 19/01/2018t o 1700 hrs on 19/01/2018.
The contingency capacity reserve required is 560 MW.
The minimum reserve available is 287 MW.
AEMO is seeking a market response.
AEMO will determine the latest time at which they would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
60795RESERVE NOTICE18/01/2018 03:18:19 PM

PDPASA - Update of the Forecast Lack of Reserve Level 2 (LOR2) in the VIC Region Friday 19th January 2018

PDPASA - Update of the Forecast Lack of Reserve Level 2 (LOR2) in the VIC Region Friday 19th January 2018

AEMO ELECTRICITY MARKET NOTICE
The Forecast LOR2 condition in the VIC region advised in AEMO Electricity Market Notice No. 60793 has been updated at 1500 hrs 18/01/2018to the following:
From 1430 hrs 19/01/2018 to 1600 hrs on 19/01/2018
The contingency capacity reserve required is 560 MW.
The minimum reserve available is 476 MW.
AEMO is seeking a market response.
AEMO determines the latest time at which they would need to intervene through an AEMO intervention event is 1515 hrs on 18/01/2018

Manager NEM Real Time Operations
60793RESERVE NOTICE18/01/2018 12:57:53 PM

PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the VIC Region Friday 19th January 2018


AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(c) of the National Electricity Rules for the VIC region for the following period:

From 1430 hrs 19/01/2018 to 1600 hrs on 19/01/2018.
The contingency capacity reserve required is 560 MW.
The minimum reserve available is 456 MW.
AEMO is seeking a market response.
AEMO will determine the latest time at which they would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations