128459INTER-REGIONAL TRANSFER07/08/2025 08:49:36 PM

Inter-regional transfer limit variation - APD A2 500/220 kV Transformer - VIC region - 07/08/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - APD A2 500/220 kV Transformer - VIC region - 07/08/2025

At 1734 hrs 07/08/2025 there was an unplanned outage of APD A2 500/220 kV Transformer

The following constraint set(s) invoked at 1750 hrs 07/08/2025
F-I_ML_APD_LOAD

This constraint set(s) contains equations with the following interconnectors on the LHS.
T-V-MNSP1

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations
     
128458POWER SYSTEM EVENTS07/08/2025 05:40:13 AM

Non-credible contingency event - SA region - 07/08/2025

AEMO ELECTRICITY MARKET NOTICE.

Non-credible contingency event - SA region - 07/08/2025

At 0507 hrs the Dorrien end of the Templers West to Dorrien 132 kV line and the Templers battery tripped.

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is not known at this stage.


Manager NEM Real Time Operations
     
128457RESERVE NOTICE06/08/2025 03:16:12 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the VIC Region on 07/08/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the VIC region advised in AEMO Electricity Market Notice No. 128455 is cancelled at 1515 hrs 06/08/2025.

Manager NEM Real Time Operations
     
128456RESERVE NOTICE06/08/2025 03:07:57 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the TAS Region on 07/08/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the TAS region advised in AEMO Electricity Market Notice No. 128430 is cancelled at 1400 hrs 06/08/2025.

AEMO Operations
     
128455RESERVE NOTICE06/08/2025 01:25:22 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the VIC Region on 07/08/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the VIC region for the following Period:


[1.] From 0730 hrs 07/08/2025 to 0800 hrs 07/08/2025.
The forecast capacity reserve requirement is 1148 MW.
The minimum capacity reserve available is 942 MW.


Manager NEM Real Time Operations
     
128453INTER-REGIONAL TRANSFER06/08/2025 09:49:32 AM

Inter-regional transfer limit variation - Red Cliffs - Wemen 220kV LINE and Koorangie - Wemen 220kV LINE - VIC region - 06/08/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Red Cliffs - Wemen 220kV LINE and Koorangie - Wemen 220kV LINE - VIC region - 06/08/2025

A planned outage of Red Cliffs - Wemen 220kV LINE and Koorangie - Wemen 220kV LINE in the VIC region was scheduled from 0700 hrs 06/08/2025 to 1800 hrs 06/08/2025.

The outage has been completed and Red Cliffs - Wemen 220kV LINE and Koorangie - Wemen 220kV LINE returned to service at 0945 hrs 06/08/2025

Constraint set(s) revoked: V-KO_WE_RC

Manager NEM Real Time Operations
     
128448INTER-REGIONAL TRANSFER05/08/2025 08:43:31 PM

Inter-regional transfer limit variation - South East 275 kV No. 2 SVC - SA region - 05/08/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - South East 275 kV No. 2 SVC - SA region - 05/08/2025

At 2036 hrs 05/08/2025 there was an unplanned outage of South East 275 kV No. 2 SVC.

The following constraint set(s) invoked at 2045 hrs 05/08/2025
S-SE_VC1

This constraint set(s) contains equations with the following interconnectors on the LHS.
V-SA

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations
     
128447NON-CONFORMANCE05/08/2025 04:55:17 PM

NON-CONFORMANCE Region SA1 Tuesday, 5 August 2025

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE SA1 Region Tuesday, 5 August 2025

AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:

Unit: HPR1
Duration: 05/08/2025 16:50 to 05/08/2025 16:55
Amount: 13 MW
Constraint: NC-S_HPR1

Auto-generated on behalf of Manager NEM Real Time Operations
     
128430RESERVE NOTICE04/08/2025 02:40:03 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the TAS Region on 07/08/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the TAS region for the following period:

From 0730 hrs to 0830 hrs 07/08/2025.
The forecast capacity reserve requirement is 582 MW.
The minimum capacity reserve available is 549 MW.

AEMO Operations
     