2024 ISP Non-network options consultation
Where the Integrated System Plan (ISP) identifies an actionable ISP project, the National Electricity Rules (NER) require AEMO to conduct consultation on non-network options to meet the identified need.
The 2024 ISP identified four new actionable projects that were not identified in previous ISPs. Further detail on the non-network options consultations for these projects is linked below. AEMO consulted on these options from June to September 2024.