AEMO is continuing its consultation conducted on Retail Procedures (Wholesale Demand Response) changes. AEMO has published a Draft Report to consult on proposed amendments. The publication of this Draft Report marks the commencement of the second stage of consultation.
Submissions should be forwarded to AEMO by COB Tuesday 2 February 2021.
Further details regarding this consultation can be found in the Draft Report. For any queries on this consultation, please contact: wdr@aemo.com.au
AEMO has prepared an Issues Paper to facilitate informed discussion and seek input from interested parties on the delivery of proposed changes to enable the Wholesale Demand Response in the National Electricity Market. Further details are provided in the Issues Paper published with this notice. A consultation draft of the following procedures is published with the Issues Paper:
- Market Settlements and Transfer Solution (MSATS) Procedures: Meter Data Management (MDM) Procedures (MDM Procedures).
- MSATS Procedures: Consumer Administration and Transfer Solution (CATS) Procedure Principles and Obligations (CATS Procedure).
- MSATS Procedures: Procedure for the Management (Wholesale, Interconnector, Generator and Sample (WIGS)) (WIGS Procedure).
- Metrology Procedure: Part B
- Retail Electricity Procedures - Glossary and Framework (Glossary and Framework).
- Business-to-Business (B2B) Guide.
- B2B e-Hub Participant Accreditation and Revocation Process (B2B Participant Process).
- Understanding Load Profiles Published from MSATS (Load Profiles Document).
Draft Report and Determination
Draft Determination
Participant Response Template
Procedure and Guidelines documents
-
15/12/2020
B2B eHub Accreditation Draft v1.3 (change marked)
735.9 KB -
15/12/2020
B2B eHub Accreditation Draft v1.3 (clean)
768.6 KB -
15/12/2020
B2B Guide v1.4.1 (change marked)
1.17 MB -
15/12/2020
B2B Guide v1.4.1 (clean)
1.17 MB -
15/12/2020
Glossary and Framework v3.3 WDR Draft (change marked)
758.36 KB -
15/12/2020
Glossary and Framework v3.3 WDR Draft (clean)
717.26 KB -
15/12/2020
Metrology Procedure Part B v7.01 Draft (change marked)
1.02 MB -
15/12/2020
Metrology Procedure Part B v7.01 Draft (clean)
1021.38 KB -
15/12/2020
MSATS Procedures CATS v4.92 Draft WDR (change marked)
2.95 MB -
15/12/2020
MSATS Procedures CATS v4.92 Draft WDR (clean)
3.12 MB -
15/12/2020
MSATS Procedures WIGS v4.92 Draft WDR (change marked)
1.94 MB -
15/12/2020
MSATS Procedures WIGS v4.92 Draft WDR (clean)
1.99 MB -
15/12/2020
MSATS Procedures MDM Procedure v4.1 Initial Draft (change marked)
927.81 KB -
15/12/2020
Understanding Load Profiles Published from MSATS v6.1 Initial (change marked)
765.86 KB
First stage submission documents
First stage submissions were received from:
-
15/12/2020
AGL
1.14 MB -
15/12/2020
Ausgrid
847.29 KB -
15/12/2020
AusNet Services
855.09 KB -
15/12/2020
CitiPower Powercor
178.4 KB -
15/12/2020
Endeavour Energy
166.09 KB -
15/12/2020
Energex and Ergon Energy
342.03 KB -
15/12/2020
Origin Energy
910.46 KB -
15/12/2020
PLUS ES
270.62 KB -
15/12/2020
Red Lumo
96.04 KB -
15/12/2020
SA Power Networks
253.55 KB -
15/12/2020
TasNetworks
430.75 KB -
15/12/2020
United Energy
178.76 KB
First stage documents
-
12/10/2020
Notice of first stage consultation
434.7 KB -
12/10/2020
Issues Paper - Retail Procedures Wholesale Demand Response
687.13 KB -
12/10/2020
B2B Guide
2.05 MB -
12/10/2020
B2B E-Hub Participant Accreditation Process
1.44 MB -
12/10/2020
Glossary and Framework
959.66 KB -
12/10/2020
Metrology Procedures Part B
1.42 MB -
12/10/2020
MSATS Procedures CATS Procedures
1.94 MB -
12/10/2020
MSATS Procedures WIGS Procedures
1.31 MB -
12/10/2020
MSATS Procedures MDM Procedure v4.1 Initial Draft Change Marked
927.81 KB -
12/10/2020
Understanding Load Profiles Published from MSATS v6.1 Initial Change Marked
765.86 KB -
12/10/2020
Participant Response Template - First Stage
47.45 KB