Removal of Controlled Load Profile and Metering Installation Reversion Provisions - SA

14/02/2025
Market National Electricity Market
StageDraft Report
ConvenorAEMO NEM
Initiated14/02/2025
Accepting submissions?Yes
Submissions close14/03/2025

The publication of this draft report commences the expedited rules consultation procedure being undertaken by AEMO on the proposal to amend the following documents, effective 1 July 2025, to remove the SA jurisdictional metrology material related to controlled load profiles (CLPs) and metering installation reversion provisions under the National Electricity Rules (NER):

  • Metrology Procedure: Part A.
  • Metrology Procedure: Part B.
  • MSATS Procedures: MDM Procedures.
  • MSATS Procedures - Principles and Obligations for All Connection Points
  • Standing Data for MSATS document.
  • Service Level Procedure: Metering Data Provider Services
  • In accordance with NER 8.9.3(b):

If a person considers that AEMO should switch to using the standard rules consultation procedure in respect of this Proposal, then the person can submit a request for AEMO to do so within 10 business days after publication of this Draft Report.

The Procedure Change Request must be sent to nem.retailprocedureconsultations@aemo.com.au by 5:00pm (Sydney time) 28 February 2025.

  • The Procedure Change Request must include reasons why the person considers the Proposal is not a Non-material Proposal as defined in NER 8.9.1(a).

    AEMO invites written submissions from interested persons in respect of this Draft Report to nem.retailprocedureconsultations@aemo.com.au by 5:00pm (Sydney time) on 14 March 2025.
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm