The publication of this draft report commences the expedited rules consultation procedure being undertaken by AEMO on the proposal to amend the following documents, effective 1 July 2025, to remove the SA jurisdictional metrology material related to controlled load profiles (CLPs) and metering installation reversion provisions under the National Electricity Rules (NER):
- Metrology Procedure: Part A.
- Metrology Procedure: Part B.
- MSATS Procedures: MDM Procedures.
- MSATS Procedures - Principles and Obligations for All Connection Points
- Standing Data for MSATS document.
- Service Level Procedure: Metering Data Provider Services
- In accordance with NER 8.9.3(b):
If a person considers that AEMO should switch to using the standard rules consultation procedure in respect of this Proposal, then the person can submit a request for AEMO to do so within 10 business days after publication of this Draft Report.
The Procedure Change Request must be sent to nem.retailprocedureconsultations@aemo.com.au by 5:00pm (Sydney time) 28 February 2025.
- The Procedure Change Request must include reasons why the person considers the Proposal is not a Non-material Proposal as defined in NER 8.9.1(a).
AEMO invites written submissions from interested persons in respect of this Draft Report to nem.retailprocedureconsultations@aemo.com.au by 5:00pm (Sydney time) on 14 March 2025.
Procedures (Change Marked):
-
14/02/2025
Metrology Procedure Part A v7.9 (change marked draft)
471.33 KB -
14/02/2025
Metrology Procedure Part B v7.9 (change marked draft).
939.09 KB -
14/02/2025
MSATS Procedures - MDM Procedure v4.8 (change marked draft)
610.07 KB -
14/02/2025
MSATS Procedures - Principles and Obligations for All Connection Points v6.1 (change market draft)
3.45 MB -
14/02/2025
Service Level Procedure MDP Services v2.5 (change marked draft)
648.08 KB -
14/02/2025
Standing Data for MSATS v6.0 (change marked draft)
1.05 MB