Timeline
-
Consultation paper published16 September 2026
-
Submissions close14 October 2026
-
Draft strategy consultationNovember 2026
-
Submissions closeNovember 2026
-
Final strategy publicationDecember 2026
Key contact
Email: [email protected]
Matter under consultation
The Australian power system is undergoing significant change, driven by increasing levels of inverter-based resources, energy storage, distributed energy resources, large industrial loads and evolving system security requirements.
To support this transition, AEMO is developing its inaugural Power System Modelling Strategy (PSMS) to establish a long-term direction and roadmap for power system modelling. The strategy will inform future modelling priorities, capability development and stakeholder engagement, and will help guide the subsequent review of the Power System Modelling Guidelines (PSMG). The PSMG review will provide stakeholders with an opportunity to help shape future modelling requirements, while addressing known industry issues and emerging modelling challenges.
Consultation submissions on the consultation paper are due in PDF format to [email protected] by 5:00 pm (Melbourne time) 14 October 2026. Please note that submissions will be published, other than confidential material, as per AEMO’s Consultation submission guidelines.
AEMO facilitated a discussion with stakeholders interested in the Power System Modelling Strategy on 30 September 2026. Slides referred to in the meeting are available below.
-
Consultation approach
-
Consultation submissions
-
Draft strategy
-
Final strategy
-
30/10/2026
AEMC
284.02 KB -
30/10/2026
Clean Energy Council
834.01 KB -
30/10/2026
CPSA
139.38 KB -
30/10/2026
DIgSILENT Pacific
1.78 MB -
30/10/2026
ElectraNet
205.23 KB -
30/10/2026
Ergon Energy Network & Energex
14.16 MB -
05/11/2026
GE Vernova
2.26 MB -
30/10/2026
MathWorks
116.34 KB -
30/10/2026
PE Simulation Software
844.52 KB -
30/10/2026
RTDS Technologies
209.79 KB -
30/10/2026
Tesla
156.78 KB -
30/10/2026
Tilt Renewables
189.14 KB