This project assessment draft report (PADR) is the second stage of the Altona – Brooklyn Terminal Station Capacity Constraint RIT-T consultation process and has been jointly prepared by Powercor and JEN in accordance with the requirements of clause 5.16 of the National Electricity Rules (NER) and section 4.2 of the RIT-T Application Guidelines. This notice incorporates the assessment results of the credible options, providing draft conclusions on the proposed preferred option for addressing the identified need in the Altona – Brooklyn Terminal Station.
Powercor and JEN invite written submissions and enquiries on the matters set out in this PADR from interested stakeholders. All submissions and enquiries should be titled “ATS-BLTS Capacity Constraint RIT-T” and directed to both [email protected] and [email protected] on or before 18 September 2026.