AEMO is conducting a consultation on B2B Procedures on behalf of the Information Exchange Committee (IEC).
The Consultation is being conducted under clause 7.17.4 of the National Electricity Rules (NER), in accordance with the Rules consultation requirements in NER 8.9.
Matter under consultation
The changes (Changes) which are proposed (Proposal) support:
- The implementation of the Accelerating Smart Meter Deployment (ASMD) Rule of the Australian Energy Market Commission (AEMC), specifically, Basic Power Quality Data.
- The removal of technical content from the applicable procedures.
The following procedures are being proposing to be created or amended under this consultation.
Instrument | New/Amended |
---|---|
Data Posting Process | New |
Customer Site Details Notification Process | Amended |
Service Order Process | Amended |
Meter Data Process | Amended |
One Way Notification Process | Amended |
Technical Delivery Specification | Amended |
B2B Guide | Amended (As part of the second stage) |
The IEC invites comments on the proposed changes contained within the Notice of Consultation. Submissions should be forwarded to NEM.Retailprocedureconsultations@aemo.com.au by 5:00pm (Melbourne time) on Thursday, 19 June 2025.
Submissions must be made using the response template linked below.
Any queries should be directed to AEMO's NEM Retail Procedures Consultation email address: NEM.Retailprocedureconsultations@aemo.com.au
First stage consultation documents
-
07/05/2025
Issues Paper
432.18 KB -
07/05/2025
Participant response template
53.95 KB -
07/05/2025
B2B Procedure: Data Posting Process v4.0
230.41 KB -
07/05/2025
B2B Procedure: Customer and Site Details Notification Process v4.0
452.67 KB -
07/05/2025
B2B Procedure: Service Order Process v4.0
1.63 MB -
07/05/2025
B2B Procedure: Meter Data Process v4.0
476.99 KB -
07/05/2025
B2B Procedure: One Way Notification Process v4.0
536.49 KB -
07/05/2025
B2B Procedure: Technical Delivery Specification Process v4.0
1.58 MB