Timeline
-
Draft FCAS Registration Guides published24 June 2026
-
Submissions due on draft Guides22 July 2026
-
Final FCAS Registration Guides publishedExpected 19 August 2026
Matter under consultation
Although formal consultation is not required under the National Electricity Rules (NER), AEMO conducted a targeted, non‑material consultation on the draft Guides in accordance with the consultation procedure (NER 8.9.3).
Submissions closed on 22 July 2026, and non-confidential submissions received are published below, as per AEMO’s consultation submission guidelines.
AEMO is currently reviewing submissions received through the consultation process and expects to publish the final Guides by 19 August 2026.
For more information on the process, please refer to the Draft Report. Alternatively, you can contact the team at [email protected].
-