The publication of this draft report commences the expedited rules consultation procedure.
In accordance with NER 8.9.3(b):
If a person considers that AEMO should switch to using the standard rules consultation procedure in respect of this Proposal, then the person can submit a request for AEMO to do so within 10 business days after publication of this Draft Report.
The Procedure Change Request must be sent to [email protected] by 5:00pm (Melbourne time) 29 June 2026.
- The Procedure Change Request must include reasons why the person considers the Proposal is not a Non-material Proposal as defined in NER 8.9.1(a).
AEMO invites written submissions from interested persons in respect of this Draft Report to [email protected] by 5:00pm (Melbourne time) on 15 July 2026.
-
Consultation documents
Procedures (Change Marked) - Effective 14 August 2026
-
12/06/2026
Audit Metering Coordinator Auditing Questions Template v1.3
531.05 KB -
12/06/2026
Basic Power Quality Data Procedure v1.2
419.09 KB -
12/06/2026
Guide to the Role of the Metering Coordinator (MC) v1.62
553.75 KB -
12/06/2026
Metrology Procedure Part A v8.14
828.5 KB -
12/06/2026
MSATS Procedures - Principles and Obligations for All Connection Points v8.02
3.8 MB -
12/06/2026
Understanding Load Profiles Published from MSATS v6.2
789.64 KB
Procedures (Change Marked) - Effective 1 November 2026
-
12/06/2026
Guide to the Role of the Metering Coordinator (MC) v1.72
549.73 KB -
12/06/2026
Metrology Procedure Part A v8.23
767.26 KB -
12/06/2026
Metrology Procedure Part B v8.23
1.16 MB -
12/06/2026
MSATS Procedures - Principles and Obligations for All Connection Points v8.13
4.2 MB -
12/06/2026
NEM RoLR Processes Part A v2.6
1.26 MB -
12/06/2026
Retail Electricity Market Procedures – Glossary and Framework v4.72
1.1 MB -
12/06/2026
Standing Data for MSATS v6.32
1.33 MB