Procedures, policies and guides
The following Procedures, Polices and Guides govern the operation of the DWGM.
The Victorian DWGM Wholesale Market Procedures detail how AEMO operates the market and the Victorian DTS. AEMO may consult on amending these documents via the Consultation webpage.
Procedures
These are the Victorian DWGM Wholesale Market Procedures are currently applied in the market:
Procedures to apply after 1 May 2024
-
28/03/2024
Wholesale Market Connection Approval Procedures
This document is the connection approval procedures effective 1 May 2024.
382.38 KB -
28/03/2024
Wholesale Market Distribution Operation Procedures
This document contains the distribution operational coordination procedures and net bidding facility procedures effective 1 May 2024.
265.23 KB -
28/03/2024
Wholesale Market Gas Quality Procedures
This document is the gas quality monitoring procedures effective 1 May 2024.
631.51 KB -
28/03/2024
Wholesale Market Maintenance Planning Procedures
This document is the maintenance planning procedures effective 1 May 2024.
401.6 KB -
28/03/2024
Wholesale Market Management Procedures
This document contains the additional reporting procedures, electronic communication procedures, gas ownership rules and rule consultation procedures effective 1 May 2024.
342.7 KB -
28/03/2024
Wholesale Market Metering Procedures
This document contains the metering uncertainty limits and calibration requirements procedures, energy calculation procedures, metering communication procedures, installation database procedures, metering installation coordination procedures, metering register procedures and data validation procedures effective 1 May 2024.
618.51 KB -
28/03/2024
Wholesale Market Operation Procedures
This document contains the accreditation procedures, administered pricing procedures, capacity certificates auction procedures, capacity certificate transfer procedures, LNG reserve procedures and gas scheduling procedures effective 1 May 2024.
1.04 MB -
28/03/2024
Wholesale Market Settlement Procedures
This document contains the ancillary payment procedures, uplift payment procedures, compensation procedures and distribution UAFG procedures effective 1 May 2024.
1.01 MB -
28/03/2024
Wholesale Market System Security Procedures
This document is the system security procedures effective 1 May 2024.
736.99 KB
Technical Documents
The following Technical Documents describe DWGM market systems as defined in the Wholesale Market Electronic Communication Procedures that apply from 1 January 2023:
Technical Documents to apply after 1 May 2024
-
16/04/2024
Election of Responsible Person and Responsible Gas Quality Monitoring Provider
115.72 KB -
28/03/2024
AEMO Victorian Pressure Correction Factors
189.51 KB -
28/03/2024
DWGM Heating Value and Gas Composition Data Sources
281.7 KB -
28/03/2024
Gas Metering CTM Data Requirements
707.95 KB -
28/03/2024
User Guide to MIBB Reports
7.55 MB -
24/06/2016
Demand Override Methodology
505.5 KB -
24/06/2016
Wholesale Gas Market Critical Location Pressures
269.38 KB
Guides
Guides applicable to the current operation of the Victorian DWGM:
-
10/02/2023
Guide to DWGM Allocation and Sub-Allocation Agents Process and Timing
Processes and related timings for activities conducted by AEMO and an allocation or sub-allocation agent.
149.01 KB -
15/12/2016
Allocation Agent MIBB Requirements (v3.0)
Information about the reports that must be transferred between an allocation agent and AEMO.
578.08 KB -
10/02/2023
DWGM Allocation and Sub-Allocation Establishment Guidelines
Guidelines for Market Participants to enter into a new allocation or sub-allocation arrangement at a particular injection or withdrawal point in the DWGM.
227.09 KB -
01/12/2022
DWGM settlement reconciliation mapping - post DWGM Enhancements
An explanation about how to use the Market Information Bulletin Board (MIBB) reports for the reconciliation of both provisional and settlement data post DWGM Enhancements that is effective from 1 January 2023.
298.45 KB -
19/06/2020
Gas market settlement revision guideline
Information about the basis in which AEMO issues revisions to final settlement statements under the National Gas Rules (NGR).
152.65 KB -
30/01/2024
Guide to DWGM contact types
A guide to DWGM contact types and and associated communications
185.6 KB