Increase in Heywood from SA to Vic test limit from 550 to 600 MW
AEMO will increase the Heywood test limit from SA to Vic (from the current 550 MW) to 600 MW today to conduct internetwork testing on Heywood.
The following constraint sets will be revoked once the testing criteria met:
I-SV_HEY_550_TEST
The following constraint sets will be invoked:
I-SV_HEY_600_TEST
AEMO will revert the Heywood test limit back to 550 MW once the test has completed while the test result being analysed.
Please also refer to the published formal PEC Stage 1 and HIC capacity release testing information at the following link: https://aemo.com.au/-/media/files/stakeholder_consultation/consultations/nem-consultations/2023/project-energyconnect-stage-1-and-hic-capacity-release/pec-stage-1-and-hic---final-test-program.pdf?la=en.
Terry Liu
AEMO Operations
Updated system normal constraints to manage Murraylink dynamic rating forecast in pre-dispatch and PASA
AEMO has now completed the production of the Murraylink dynamic rating forecast model and the forecasting performance has been satisfactory during the test. AEMO will be enabling the pre-dispatch and PASA formulation using the Murraylink dynamic rating forecast on the following two constraint equations at 1000 hrs on Wednesday 27th May 2026.
VSML_RAT_LIM_DYN
SVML_RAT_LIM_DYN
For full details on the formulation, the updated constraint equations have now been loaded into AEMO's pre-production systems.
Terry Liu
AEMO Operations
Updated maximum generation contingency size in Victoria from 600 MW to 750 MW
This change affects the generator limitations for prior outage conditions especially in the South-west Victoria area. The new generation limitation for outages is now 750 MW. AEMO has implemented this change in production on 13th May 2026 by updating generation constraints to increase the generation upper limits for outage conditions.
Please refer to the Network Outage Schedule for any upcoming outages in south-west Victoria here.
https://www.aemo.com.au/energy-systems/electricity/national-electricity-market-nem/data-nem/network-data/network-outage-schedule
For further details on this change please refer to VicGrid Limits Advice or contact VicGrid.
vicgrid.com.au/transmission-planning/planning-the-energy-grid
Terry Liu
AEMO Operations
[EventId:202604272335_confirmed] Prices for interval 27-Apr-2026 23:35 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0000 hrs on 28 April 2026
PRICES ARE NOW CONFIRMED for trading interval 27-Apr-2026 23:35.
In accordance with Market Notice 143994 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202604280000_confirmed] Prices for interval 28-Apr-2026 00:00 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0000 hrs on 28 April 2026
PRICES ARE NOW CONFIRMED for trading interval 28-Apr-2026 00:00.
In accordance with Market Notice 143999 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202604272355_confirmed] Prices for interval 27-Apr-2026 23:55 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0000 hrs on 28 April 2026
PRICES ARE NOW CONFIRMED for trading interval 27-Apr-2026 23:55.
In accordance with Market Notice 143998 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202604272350_confirmed] Prices for interval 27-Apr-2026 23:50 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0000 hrs on 28 April 2026
PRICES ARE NOW CONFIRMED for trading interval 27-Apr-2026 23:50.
In accordance with Market Notice 143997 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202604272345_confirmed] Prices for interval 27-Apr-2026 23:45 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0000 hrs on 28 April 2026
PRICES ARE NOW CONFIRMED for trading interval 27-Apr-2026 23:45.
In accordance with Market Notice 143996 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202604272340_confirmed] Prices for interval 27-Apr-2026 23:40 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0000 hrs on 28 April 2026
PRICES ARE NOW CONFIRMED for trading interval 27-Apr-2026 23:40.
In accordance with Market Notice 143995 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.