Increase in Heywood from SA to Vic test limit from 550 to 600 MW
AEMO will increase the Heywood test limit from SA to Vic (from the current 550 MW) to 600 MW today to conduct internetwork testing on Heywood.
The following constraint sets will be revoked once the testing criteria met:
I-SV_HEY_550_TEST
The following constraint sets will be invoked:
I-SV_HEY_600_TEST
AEMO will revert the Heywood test limit back to 550 MW once the test has completed while the test result being analysed.
Please also refer to the published formal PEC Stage 1 and HIC capacity release testing information at the following link: https://aemo.com.au/-/media/files/stakeholder_consultation/consultations/nem-consultations/2023/project-energyconnect-stage-1-and-hic-capacity-release/pec-stage-1-and-hic---final-test-program.pdf?la=en.
Terry Liu
AEMO Operations
[EventId:202606012000_NRM_VIC1_NSW1_stopped] NEGRES CONSTRAINT NRM_VIC1_NSW1 ceased operating from 01 June 2026 20:00
Issued by Australian Energy Market Operator Ltd at 2000 hrs on 1 June 2026
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to NSW - 1 June 2026.
Refer to market notice: 144181
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to NSW directional interconnector.
The negative residue constraint NRM_VIC1_NSW1 ceased operating at 2000 hrs on 1 June 2026.
This is an AEMO autogenerated Market Notice.
[EventId:202606011820_NRM_VIC1_NSW1_started] NEGRES CONSTRAINT NRM_VIC1_NSW1 started operating from 01 June 2026 18:20
Issued by Australian Energy Market Operator Ltd at 1820 hrs on 1 June 2026
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to NSW - 1 June 2026.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to NSW directional interconnector.
The negative residue constraint set NRM_VIC1_NSW1 commenced operating from 1820 hrs on 1 June 2026.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
Updated system normal constraints to manage Murraylink dynamic rating forecast in pre-dispatch and PASA
AEMO has now completed the production of the Murraylink dynamic rating forecast model and the forecasting performance has been satisfactory during the test. AEMO will be enabling the pre-dispatch and PASA formulation using the Murraylink dynamic rating forecast on the following two constraint equations at 1000 hrs on Wednesday 27th May 2026.
VSML_RAT_LIM_DYN
SVML_RAT_LIM_DYN
For full details on the formulation, the updated constraint equations have now been loaded into AEMO's pre-production systems.
Terry Liu
AEMO Operations
Updated maximum generation contingency size in Victoria from 600 MW to 750 MW
This change affects the generator limitations for prior outage conditions especially in the South-west Victoria area. The new generation limitation for outages is now 750 MW. AEMO has implemented this change in production on 13th May 2026 by updating generation constraints to increase the generation upper limits for outage conditions.
Please refer to the Network Outage Schedule for any upcoming outages in south-west Victoria here.
https://www.aemo.com.au/energy-systems/electricity/national-electricity-market-nem/data-nem/network-data/network-outage-schedule
For further details on this change please refer to VicGrid Limits Advice or contact VicGrid.
vicgrid.com.au/transmission-planning/planning-the-energy-grid
Terry Liu
AEMO Operations
[EventId:202604131615_NRM_QLD1_NSW1_stopped] NEGRES CONSTRAINT NRM_QLD1_NSW1 ceased operating from 13 April 2026 16:15
Issued by Australian Energy Market Operator Ltd at 1615 hrs on 13 April 2026
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 13 April 2026.
Refer to market notice: 141054
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the QLD to NSW directional interconnector.
The negative residue constraint NRM_QLD1_NSW1 ceased operating at 1615 hrs on 13 April 2026.
This is an AEMO autogenerated Market Notice.
[EventId:202604131535_NRM_QLD1_NSW1_started] NEGRES CONSTRAINT NRM_QLD1_NSW1 started operating from 13 April 2026 15:35
Issued by Australian Energy Market Operator Ltd at 1535 hrs on 13 April 2026
ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 13 April 2026.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the QLD to NSW directional interconnector.
The negative residue constraint set NRM_QLD1_NSW1 commenced operating from 1535 hrs on 13 April 2026.
This constraint set contains an equation with the following interconnectors on the LHS:
N-Q-MNSP1
NSW1-QLD1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202604101945_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 10 April 2026 19:45
Issued by Australian Energy Market Operator Ltd at 1945 hrs on 10 April 2026
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 10 April 2026.
Refer to market notice: 141014
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1945 hrs on 10 April 2026.
This is an AEMO autogenerated Market Notice.
[EventId:202604101900_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 10 April 2026 19:00
Issued by Australian Energy Market Operator Ltd at 1900 hrs on 10 April 2026
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 10 April 2026.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1900 hrs on 10 April 2026.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.