Filter by category
Filter by Date
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 17/05/2026
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 144106 is cancelled at 1400 hrs 17/05/2026.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 18/05/2026
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:
[1.] From 1700 hrs 18/05/2026 to 1900 hrs 18/05/2026.
The forecast capacity reserve requirement is 759 MW.
The minimum capacity reserve available is 357 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 19/05/2026
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 144093 is cancelled at 1030 hrs 17/05/2026.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 19/05/2026
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:
[1.] From 0600 hrs 19/05/2026 to 1930 hrs 19/05/2026.
The forecast capacity reserve requirement is 760 MW.
The minimum capacity reserve available is 605 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
Network Augmentation Commissioned - NSW Region - 09 May 2026
A network augmentation has been commissioned in the NSW Region.
At 1740 hrs the following equipment was commissioned.
Wagga - Dinawan 6L 330 kV Line
Wagga - Dinawan 6J 330 kV Line
Dinawan 330 kV A and B Buses
Manager NEM Real Time Operations
Fast Frequency Response Market - Local dispatch of Very Fast Contingency FCAS in QLD
Following a review of the operation of the Very Fast FCAS market, from 5th May 2026 AEMO will increase the cap on dispatch of Very Fast Contingency FCAS in the QLD region from 200 MW to 250 MW, during periods where islanding of the QLD region is considered credible.
No other changes to the dispatch of Very Fast FCAS or FCAS constraint equations will be made on this date.
For more information on the Fast Frequency Response (FFR) initiative, please visit:
https://www.aemo.com.au/initiatives/major-programs/fast-frequency-response
AEMO Operations
[EventId:202604272335_confirmed] Prices for interval 27-Apr-2026 23:35 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0000 hrs on 28 April 2026
PRICES ARE NOW CONFIRMED for trading interval 27-Apr-2026 23:35.
In accordance with Market Notice 143994 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202604280000_confirmed] Prices for interval 28-Apr-2026 00:00 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0000 hrs on 28 April 2026
PRICES ARE NOW CONFIRMED for trading interval 28-Apr-2026 00:00.
In accordance with Market Notice 143999 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202604272355_confirmed] Prices for interval 27-Apr-2026 23:55 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0000 hrs on 28 April 2026
PRICES ARE NOW CONFIRMED for trading interval 27-Apr-2026 23:55.
In accordance with Market Notice 143998 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.