144107RESERVE NOTICE17/05/2026 02:14:43 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 17/05/2026

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 144106 is cancelled at 1400 hrs 17/05/2026.

Manager NEM Real Time Operations
     
144106RESERVE NOTICE17/05/2026 01:28:35 PM

PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 18/05/2026

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:


[1.] From 1700 hrs 18/05/2026 to 1900 hrs 18/05/2026.
The forecast capacity reserve requirement is 759 MW.
The minimum capacity reserve available is 357 MW.


AEMO is seeking a market response.

AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.


Manager NEM Real Time Operations
     
144103RESERVE NOTICE17/05/2026 10:41:04 AM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 19/05/2026

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 144093 is cancelled at 1030 hrs 17/05/2026.

Manager NEM Real Time Operations
     
144093RESERVE NOTICE16/05/2026 04:47:27 PM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 19/05/2026

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:

[1.] From 0600 hrs 19/05/2026 to 1930 hrs 19/05/2026.
The forecast capacity reserve requirement is 760 MW.
The minimum capacity reserve available is 605 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.


Manager NEM Real Time Operations
     
144069GENERAL NOTICE09/05/2026 06:04:42 PM

Network Augmentation Commissioned - NSW Region - 09 May 2026

AEMO ELECTRICITY MARKET NOTICE

A network augmentation has been commissioned in the NSW Region.

At 1740 hrs the following equipment was commissioned.

Wagga - Dinawan 6L 330 kV Line
Wagga - Dinawan 6J 330 kV Line
Dinawan 330 kV A and B Buses

Manager NEM Real Time Operations
     
144024GENERAL NOTICE01/05/2026 09:58:31 AM

Fast Frequency Response Market - Local dispatch of Very Fast Contingency FCAS in QLD

AEMO ELECTRICITY MARKET NOTICE

Following a review of the operation of the Very Fast FCAS market, from 5th May 2026 AEMO will increase the cap on dispatch of Very Fast Contingency FCAS in the QLD region from 200 MW to 250 MW, during periods where islanding of the QLD region is considered credible.

No other changes to the dispatch of Very Fast FCAS or FCAS constraint equations will be made on this date.

For more information on the Fast Frequency Response (FFR) initiative, please visit:
https://www.aemo.com.au/initiatives/major-programs/fast-frequency-response

AEMO Operations
     
141068GENERAL NOTICE14/04/2026 07:34:16 PM

Update - Vulnerable lines in Tas region

AEMO ELECTRICITY MARKET NOTICE.

Update - Lightning vulnerable lines in Tas region

Refer to AEMO Electricity Market Notice 141036

At 1357hrs 11/04/2026 the Farrell -Tribute 220 kV line and Farrell - John Butters 220kV Line tripped.

The cause of the trip was identified as due to lightning.
In accordance with SO_OP_3715, AEMO now considers the Farrell -Tribute 220 kV line and the Farrell - John Butters 220kV line to be vulnerable with a category of probable due to lightning.

Manager NEM Real Time Operations
     
139633GENERAL NOTICE01/04/2026 05:22:53 PM

Network Augmentation Commissioned - NSW Region - 01/04/2026

AEMO ELECTRICITY MARKET NOTICE


Network Augmentation Commissioned - NSW Region - 01/04/2026

At 1700 hrs 01/04/2026, the Uungula 330 kV Terminal Station has been cut in to the existing Wellington - Stubbo SF 330 kV Transmission Line resulting in the following network augmentations being commissioned:

Uungula 330 kV Terminal Station
Wellington - Uungula 7J 330 kV Transmission Line
Uungula -Stubbo SF 79 330 kV Transmission Line

Manager NEM Real Time Operations
     
138271RESERVE NOTICE29/03/2026 01:10:38 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 30/03/2026

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 138260 is cancelled at 1310 hrs 29/03/2026.

Manager NEM Real Time Operations