144207RESERVE NOTICE08/06/2026 07:39:18 AM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 10/06/2026

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 144205 has been updated to the following:

[1.] From 0800 hrs 10/06/2026 to 1100 hrs 10/06/2026.
The forecast capacity reserve requirement is 606 MW.
The minimum capacity reserve available is 443 MW.

[2.] From 1530 hrs 10/06/2026 to 1630 hrs 10/06/2026.
The forecast capacity reserve requirement is 456 MW.
The minimum capacity reserve available is 379 MW.



AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
     
144206RESERVE NOTICE07/06/2026 06:05:18 PM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 10/06/2026

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 144205 has been updated to the following:

[1.] From 0830 hrs 10/06/2026 to 1700 hrs 10/06/2026.
The forecast capacity reserve requirement is 571 MW.
The minimum capacity reserve available is 384 MW.

AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
     
144205RESERVE NOTICE07/06/2026 10:50:08 AM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 10/06/2026

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:

[1.] From 0800 hrs 10/06/2026 to 1000 hrs 10/06/2026.
The forecast capacity reserve requirement is 744 MW.
The minimum capacity reserve available is 542 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
     
144182SETTLEMENTS RESIDUE01/06/2026 08:00:21 PM

[EventId:202606012000_NRM_VIC1_NSW1_stopped] NEGRES CONSTRAINT NRM_VIC1_NSW1 ceased operating from 01 June 2026 20:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 2000 hrs on 1 June 2026

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to NSW - 1 June 2026.

Refer to market notice: 144181

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to NSW directional interconnector.

The negative residue constraint NRM_VIC1_NSW1 ceased operating at 2000 hrs on 1 June 2026.

This is an AEMO autogenerated Market Notice.
     
144181SETTLEMENTS RESIDUE01/06/2026 06:20:20 PM

[EventId:202606011820_NRM_VIC1_NSW1_started] NEGRES CONSTRAINT NRM_VIC1_NSW1 started operating from 01 June 2026 18:20

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1820 hrs on 1 June 2026

ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to NSW - 1 June 2026.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to NSW directional interconnector.

The negative residue constraint set NRM_VIC1_NSW1 commenced operating from 1820 hrs on 1 June 2026.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
144114RESERVE NOTICE18/05/2026 10:16:42 AM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 18/05/2026

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 144111 is cancelled at 1015 hrs 18/05/2026.

Manager NEM Real Time Operations
     
144111RESERVE NOTICE17/05/2026 08:20:51 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 18/05/2026

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 144108 has been updated to the following:

[1.] From 1700 hrs 18/05/2026 to 1900 hrs 18/05/2026.
The forecast capacity reserve requirement is 1194 MW.
The minimum capacity reserve available is 1014 MW.

Manager NEM Real Time Operations
     
144109RESERVE NOTICE17/05/2026 02:34:41 PM

ST PASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 19/01/2026

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 144092 has been updated to the following:

[1.] From 0600 hrs 19/05/2026 to 1930 hrs 19/05/2026.
The forecast capacity reserve requirement is 1197 MW.
The minimum capacity reserve available is 1012 MW.

[2.] From 2130 hrs 19/05/2026 to 2200 hrs 19/05/2026.
The forecast capacity reserve requirement is 1199 MW.
The minimum capacity reserve available is 1146 MW.


Manager NEM Real Time Operations
     
144108RESERVE NOTICE17/05/2026 02:20:46 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 18/05/2026

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Periods:


[1.] From 1700 hrs 18/05/2026 to 1930 hrs 18/05/2026.
The forecast capacity reserve requirement is 1194 MW.
The minimum capacity reserve available is 829 MW.


[2.] From 2200 hrs 18/05/2026 to 2230 hrs 18/05/2026.
The forecast capacity reserve requirement is 1197 MW.
The minimum capacity reserve available is 1194 MW.


Manager NEM Real Time Operations
     