STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 10/06/2026
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 144213 is cancelled at 0220 hrs 09/06/2026.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 10/06/2026
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 144212 has been updated to the following:
[1.] From 1030 hrs 10/06/2026 to 1230 hrs 10/06/2026.
The forecast capacity reserve requirement is 530 MW.
The minimum capacity reserve available is 517 MW.
AEMO is seeking a market response.
AEMO estimates the latest time at which permission can be withheld for an upcoming planned outage is 0800 hrs on 10/06/2026.
Manager NEM Real Time Operations
STPASA - Update to Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 10/06/2026
Refer to MN 144207
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:
[1.] From 1030 hrs 10/06/2026 to 1100 hrs 10/06/2026.
The forecast capacity reserve requirement is 570 MW.
The minimum capacity reserve available is 566 MW.
AEMO is seeking a market response.
AEMO estimates the latest time at which permission can be withheld for an upcoming planned outage is 0800 hrs on 09/06/2026.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 10/06/2026
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 144205 has been updated to the following:
[1.] From 0800 hrs 10/06/2026 to 1100 hrs 10/06/2026.
The forecast capacity reserve requirement is 606 MW.
The minimum capacity reserve available is 443 MW.
[2.] From 1530 hrs 10/06/2026 to 1630 hrs 10/06/2026.
The forecast capacity reserve requirement is 456 MW.
The minimum capacity reserve available is 379 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 10/06/2026
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 144205 has been updated to the following:
[1.] From 0830 hrs 10/06/2026 to 1700 hrs 10/06/2026.
The forecast capacity reserve requirement is 571 MW.
The minimum capacity reserve available is 384 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 10/06/2026
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:
[1.] From 0800 hrs 10/06/2026 to 1000 hrs 10/06/2026.
The forecast capacity reserve requirement is 744 MW.
The minimum capacity reserve available is 542 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Koorangie to Wemen 220 kV Line - VIC region - 05/06/2026
Inter-regional transfer limit variation - Koorangie to Wemen 220 kV Line - VIC region - 05/06/2026
A planned outage of Koorangie to Wemen 220 kV Line in the VIC region was scheduled from 1130 hrs 25/05/2026 to 1700 hrs 08/06/2026.
The outage has been completed and Koorangie to Wemen 220 kV Line returned to service at 1920 hrs 05/06/2026
Constraint set(s) revoked: V-KOWE
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Directlink - NSW region
Inter-regional transfer limit variation - Directlink No. 3 Leg - NSW region - 05/06/2026
A planned outage of Directlink No. 3 Leg in the NSW region was scheduled from 0700 hrs 01/06/2026 to 1600 hrs 08/06/2026.
The outage has been completed and Directlink No. 3 Leg returned to service at 1150 hrs 05/05/2026
Constraint set(s) revoked: N-MBTE_1
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Heywood M1 500/275kV XFMR - VIC region - 29/05/2026
Inter-regional transfer limit variation - Heywood M1 500/275kV XFMR - VIC region - 29/05/2026
A planned outage of Heywood M1 500/275kV XFMR in the VIC region was scheduled from 1100 hrs 25/05/2026 to 1800 hrs 29/05/2026.
The outage has been completed and Heywood M1 500/275kV XFMR returned to service at 0920 hrs 29/05/2026
Constraint set(s) revoked: V-HYTX_M12