144182SETTLEMENTS RESIDUE01/06/2026 08:00:21 PM

[EventId:202606012000_NRM_VIC1_NSW1_stopped] NEGRES CONSTRAINT NRM_VIC1_NSW1 ceased operating from 01 June 2026 20:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 2000 hrs on 1 June 2026

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to NSW - 1 June 2026.

Refer to market notice: 144181

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to NSW directional interconnector.

The negative residue constraint NRM_VIC1_NSW1 ceased operating at 2000 hrs on 1 June 2026.

This is an AEMO autogenerated Market Notice.
     
144181SETTLEMENTS RESIDUE01/06/2026 06:20:20 PM

[EventId:202606011820_NRM_VIC1_NSW1_started] NEGRES CONSTRAINT NRM_VIC1_NSW1 started operating from 01 June 2026 18:20

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1820 hrs on 1 June 2026

ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to NSW - 1 June 2026.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to NSW directional interconnector.

The negative residue constraint set NRM_VIC1_NSW1 commenced operating from 1820 hrs on 1 June 2026.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
144110MINIMUM SYSTEM LOAD17/05/2026 02:42:23 PM

Cancellation of [Forecast, Actual]Minimum System Load (MSL) MSL1 event in the SA Region on 17/05/2026.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of [Forecast, Actual]Minimum System Load (MSL) MSL1 event in the SA Region on 17/05/2026.

Cancellation - [Forecast, Actual]MSL1- SA Region at 1430 hrs 17/05/2026.

Refer to Market Notice 144105for MSL1.

Manager NEM Real Time Operations
     
144105MINIMUM SYSTEM LOAD17/05/2026 01:17:19 PM

Forecast Minimum System Load MSL1 condition in the SA Region on 17/05/2026

AEMO ELECTRICITY MARKET NOTICE
Forecast Minimum System Load MSL1 condition in the SA Region on 17/05/2026

AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the SA on 17/05/2026.

Minimum System Load (MSL) conditions are forecast when demand is less than the relevant MSL threshold. The advisory MSL thresholds are:
- MSL1: 603 MW
- MSL2: 328 MW
- MSL3: 113 MW

The demand is forecast to be below the MSL1 threshold for the following period[s]:
- From 1300 hrs 17/05/2026 to 1400 hrs 17/05/2026. Minimum demand is forecast to be 576 MW at 1400 hrs.


Forecast demand refers to forecast Operational Demand that excludes contribution from Significant Non-Scheduled Generation: see definitions at https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/data-nem/operational-demand-data .
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.


Manager NEM Real Time Operations
     
141139MINIMUM SYSTEM LOAD18/04/2026 02:15:11 PM

Cancellation of ActualMinimum System Load (MSL) MSL1 event in the SA Region on 18/04/2026.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of ActualMinimum System Load (MSL) MSL1 event in the SA Region on 18/04/2026.

Cancellation - ActualMSL1- SA Region at 1405 hrs 18/04/2026.

Refer to Market Notice 141138 for MSL1.

Manager NEM Real Time Operations
     
141138MINIMUM SYSTEM LOAD18/04/2026 12:35:23 PM

Actual Minimum System Load MSL1 condition in the SA Region on 18/04/2026

AEMO ELECTRICITY MARKET NOTICE
Actual Minimum System Load MSL1 condition in the SA Region on 18/04/2026

AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the SA on 18/04/2026.

The advisory MSL thresholds are:
- MSL1: 54 MW
- MSL2: -97 MW
- MSL3: -448 MW

The demand is below the MSL1 threshold.

Demand refers to Operational Demand that excludes contribution from Significant Non-Scheduled Generation: see definitions at https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/data-nem/operational-demand-data .

Manager NEM Real Time Operations
     
141067SETTLEMENTS RESIDUE13/04/2026 04:15:40 PM

[EventId:202604131615_NRM_QLD1_NSW1_stopped] NEGRES CONSTRAINT NRM_QLD1_NSW1 ceased operating from 13 April 2026 16:15

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1615 hrs on 13 April 2026

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 13 April 2026.

Refer to market notice: 141054

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the QLD to NSW directional interconnector.

The negative residue constraint NRM_QLD1_NSW1 ceased operating at 1615 hrs on 13 April 2026.

This is an AEMO autogenerated Market Notice.
     
141054SETTLEMENTS RESIDUE13/04/2026 03:35:25 PM

[EventId:202604131535_NRM_QLD1_NSW1_started] NEGRES CONSTRAINT NRM_QLD1_NSW1 started operating from 13 April 2026 15:35

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1535 hrs on 13 April 2026

ACTUAL NEGATIVE SETTLEMENT RESIDUES - QLD to NSW - 13 April 2026.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the QLD to NSW directional interconnector.

The negative residue constraint set NRM_QLD1_NSW1 commenced operating from 1535 hrs on 13 April 2026.

This constraint set contains an equation with the following interconnectors on the LHS:
N-Q-MNSP1
NSW1-QLD1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
141018SETTLEMENTS RESIDUE10/04/2026 07:45:26 PM

[EventId:202604101945_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 10 April 2026 19:45

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1945 hrs on 10 April 2026

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 10 April 2026.

Refer to market notice: 141014

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1945 hrs on 10 April 2026.

This is an AEMO autogenerated Market Notice.
     