Inter-regional transfer limit variation - Directlnk DC2 80kV LINE- NSW region - 22/12/2025
Inter-regional transfer limit variation - Directlnk DC2 80kV LINE- NSW region - 22/12/2025
A planned outage of Directlnk DC2 80kV LINE in the NSW region was scheduled from 1520 hrs 21/12/2025 to 1700 hrs 22/12/2025.
The outage has been completed and Directlnk DC2 80kV LINE returned to service at 0910 hrs 22/12/2025
Constraint set(s) revoked: N-X_MBTE_1
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Kemps Creek 500/330 kV #3 Transformer - NSW region - 20/12/2025
Inter-regional transfer limit variation - Kemps Creek 500/330 kV #3 Transformer - NSW region - 20/12/2025
At 2104 hrs 20/12/2025 there was an unplanned outage of Kemps Creek 500/330 kV #3 Transformer.
The following constraint set(s) invoked at 2115 hrs 20/12/2025
N-KC_TX
This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1,NSW1-QLD1,VIC1-NSW1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Cancellation of Actual (LOR2) condition in the NSW region - 19/12/2025
Cancellation of Actual (LOR2) condition in the NSW region - 19/12/2025
The Actual LOR2 Condition in the NSW Region advised in AEMO Electricity Market Notice No.131880 is cancelled at 1715 hrs 19/12/2025.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 2 (LOR2) in the NSW region - 19/12/2025
Actual Lack Of Reserve Level 2 (LOR2) in the NSW region - 19/12/2025
An Actual LOR2 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1600 hrs.
The Actual LOR2 condition is forecast to exist until 19/12/2025 1700 hrs
The capacity reserve required is 700 MW
The minimum reserve available is 664 MW
AEMO is seeking an immediate market response.
An insufficient market response may require AEMO to implement a AEMO intervention event.
Manager NEM Real Time Operations
Cancellation of Actual (LOR2) condition in the NSW region - 18/12/2025
Cancellation of Actual (LOR2) condition in the NSW region - 18/12/2025
The Actual LOR2 Condition in the NSW Region advised in AEMO Electricity Market Notice No.131794 is cancelled at 1915 hrs 18/12/2025.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 2 (LOR2) in the NSW region - 18/12/2025
Actual Lack Of Reserve Level 2 (LOR2) in the NSW region - 18/12/2025
An Actual LOR2 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1730 hrs.
The Actual LOR2 condition is forecast to exist until 18/12/2025 1800 hrs
The capacity reserve required is 700 MW
The minimum reserve available is 673 MW
AEMO is seeking an immediate market response.
An insufficient market response may require AEMO to implement a AEMO intervention event.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Halys-Braemar 8814 275kV LINE - QLD region - 18/12/2025
Inter-regional transfer limit variation - Halys-Braemar 8814 275kV LINE - QLD region - 18/12/2025
At 0759 hrs 18/12/2025 there was an unplanned outage of Halys-Braemar 8814 275kV LINE.
The following constraint set invoked at 0805 hrs 18/12/2025
Q-BRHA
This constraint set contains equations with the following interconnectors on the LHS.
NSW1-QLD1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Tamworth 1 330kV SVC - NSW region - 16/12/2025
Inter-regional transfer limit variation - Tamworth 1 330kV SVC - NSW region - 16/12/2025
At 1642 hrs 16/12/2025 there was an unplanned outage of Tamworth 1 330kV SVC.
The following constraint set invoked at 1650 hrs 16/12/2025
N-TW_SVC
This constraint set contains equations with the following interconnectors on the LHS.
N-Q-MNSP1,NSW1-QLD1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Dapto - Sydney South (11) 330kV line- NSW region - 16/12/2025
Inter-regional transfer limit variation - Dapto - Sydney South (11) 330kV line- NSW region - 16/12/2025
A planned outage of Dapto - Sydney South (11) 330kV line in the NSW region was scheduled from 0630 hrs 16/12/2025 to 1500 hrs 17/12/2025.
The outage has been completed and Dapto - Sydney South (11) 330kV line returned to service at 1352 hrs 16/12/2025
Constraint set(s) revoked: N-DTSS_11
Manager NEM Real Time Operations