Market Notices

132616INTER-REGIONAL TRANSFER09/01/2026 02:21:47 PM

Inter-regional transfer limit variation - constraint automation to manage Power System Security in VIC region - 09/01/2026

AEMO ELECTRICITY MARKET NOTICE

In order to maintain the power system in a secure operating state in the VIC region, AEMO has invoked automated constraint set CA_BRIS_58730C07 from 1410 hrs until further notice.
This constraint set contains equations with the following interconnector on the LHS;

V-S-MNSP1
VIC1-NSW1

Manager NEM Real Time Operations
132556INTER-REGIONAL TRANSFER08/01/2026 02:45:35 AM

Inter-regional transfer limit variation - Mt England Tarong (8812) 275kV Line - QLD region - 08/01/2026

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Mt England Tarong (8812) 275kV Line - QLD region - 08/01/2026

At 0240 hrs 08/01/2026 there was a short notice outage of Mt England Tarong (8812) 275kV Line.

The following constraint set(s) invoked at 0240 hrs 08/01/2026
Q-TRME

This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1,NSW1-QLD1

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations
132084INTER-REGIONAL TRANSFER24/12/2025 01:42:19 PM

Inter-regional transfer limit variation - Liverpool - Sydney South No. 12 330 kV Line - NSW region - 24/12/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Liverpool - Sydney South No. 12 330 kV Line - NSW region - 24/12/2025

At 1314 hrs 24/12/2025 there was a short notice outage of Liverpool - Sydney South No. 12 330 kV Line.

The following constraint set(s) invoked at 1315 hrs 24/12/2025
N-LPSS_12

This constraint set(s) contains equations with the following interconnectors on the LHS.
VIC1-NSW1,N-Q-MNSP1,NSW1-QLD1

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations
132042INTER-REGIONAL TRANSFER23/12/2025 08:46:10 AM

Inter-regional transfer limit variation - [outage element] - NSW region - 23/12/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - [outage element] - NSW region - 23/12/2025

A planned outage of Tamworth 1 330kV SVC in the NSW region was scheduled from 0640 hrs 16/12/2025 to 1640 hrs 31/12/2025.

The outage has been completed and Tamworth 1 330kV SVC returned to service at 0845 hrs 23/12/2025

Constraint set(s) revoked: N-TW_SVC

Manager NEM Real Time Operations
132003INTER-REGIONAL TRANSFER22/12/2025 10:00:51 AM

Inter-regional transfer limit variation - Directlnk DC2 80kV LINE- NSW region - 22/12/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Directlnk DC2 80kV LINE- NSW region - 22/12/2025

A planned outage of Directlnk DC2 80kV LINE in the NSW region was scheduled from 1520 hrs 21/12/2025 to 1700 hrs 22/12/2025.

The outage has been completed and Directlnk DC2 80kV LINE returned to service at 0910 hrs 22/12/2025

Constraint set(s) revoked: N-X_MBTE_1

Manager NEM Real Time Operations
131954INTER-REGIONAL TRANSFER20/12/2025 09:28:50 PM

Inter-regional transfer limit variation - Kemps Creek 500/330 kV #3 Transformer - NSW region - 20/12/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Kemps Creek 500/330 kV #3 Transformer - NSW region - 20/12/2025

At 2104 hrs 20/12/2025 there was an unplanned outage of Kemps Creek 500/330 kV #3 Transformer.

The following constraint set(s) invoked at 2115 hrs 20/12/2025
N-KC_TX

This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1,NSW1-QLD1,VIC1-NSW1

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations
131766RESERVE NOTICE18/12/2025 10:40:39 AM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 3 (LOR3) in the NSW Region on 18/12/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR3 condition in the NSW region advised in AEMO Electricity Market Notice No. 131762 is cancelled at 1040 hrs 18/12/2025

Manager NEM Real Time Operations
131762RESERVE NOTICE18/12/2025 09:48:57 AM

PDPASA - Forecast Lack Of Reserve Level 3 (LOR3) in the NSW Region on 18/12/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR3 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:


[1.] From 1830 hrs 18/12/2025 to 1930 hrs 18/12/2025.
The maximum load (other than interruptible loads) forecast to be interrupted is 50 MW at approximately 1900 hrs.


AEMO is seeking a market response.


AEMO estimates the latest time at which it would need to intervene through an AEMO intervention event is 1300 hrs on 18/12/2025.

Manager NEM Real Time Operations
131760INTER-REGIONAL TRANSFER18/12/2025 08:16:45 AM

Inter-regional transfer limit variation - Halys-Braemar 8814 275kV LINE - QLD region - 18/12/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Halys-Braemar 8814 275kV LINE - QLD region - 18/12/2025

At 0759 hrs 18/12/2025 there was an unplanned outage of Halys-Braemar 8814 275kV LINE.

The following constraint set invoked at 0805 hrs 18/12/2025
Q-BRHA

This constraint set contains equations with the following interconnectors on the LHS.
NSW1-QLD1

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations