Inter-regional transfer limit variation - Vineyard - Sydney West 29 330kV line - NSW region - 18/03/2026
Inter-regional transfer limit variation - Vineyard - Sydney West 29 330kV line - NSW region - 18/03/2026
At 1000 hrs 18/03/2026 there was an unplanned outage of Vineyard - Sydney West 29 330kV line.
The following constraint set(s) invoked at 1010 hrs 18/03/2026
N-SWVY_29
This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1,NSW1-QLD1,VIC1-NSW1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Inter-Regional Transfer limit variation - Murraylink
Inter-Regional Transfer limit variation - Murraylink
There has been an unplanned outage of Murraylink.
The following constraint set was invoked at 1030 hrs 17/03/2026
I-MURRAYLINK
The constraint set contains the following interconnector on the left hand side.
VIC1-NSW1,V-S-MNSP1
Refer to AEMO Network Outage Scheduler (NOS) for further details.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Armidale 1 330kV SVC - NSW region - 16/03/2026
Inter-regional transfer limit variation - Armidale 1 330kV SVC - NSW region - 16/03/2026
At 1630 hrs 16/03/2026 there was a short notice outage of Armidale 1 330kV SVC.
The following constraint set(s) invoked at 1630 hrs 16/03/2026
N-AR_VC1
This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1,NSW1-QLD1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Inter-Regional Transfer limit variation - Directlink - NSW Region
Inter-Regional Transfer limit variation - Directlink - NSW Region
There has been an unplanned outage of the No 2 Leg of Directlink .
The following constraint set was invoked at 2345 hrs 14/03/2026
N-MBTE_1
The constraint set contains the following interconnector on the left hand side.
N-Q-MNSP1
Refer AEMO Network Outage Scheduler (NOS) for further details.
Manager NEM Real Time Operations
Cancellation of Actual Minimum System Load (MSL) MSL1 event in the SA Region on 14/03/2026.
Cancellation of Actual Minimum System Load (MSL) MSL1 event in the SA Region on 14/03/2026.
Cancellation - Actual MSL1- SA Region at 1415 hrs 14/03/2026.
Refer to Market Notice 134801for MSL1.
Manager NEM Real Time Operations
Actual Minimum System Load MSL1 condition in the SA Region on 14/03/2026
Actual Minimum System Load MSL1 condition in the SA Region on 14/03/2026
AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the SA on 09/03/2026.
The advisory MSL thresholds are:
- MSL1: 32 MW
- MSL2: -119 MW
- MSL3: -470 MW
The demand is below the MSL1 threshold.
Demand refers to Operational Demand that excludes contribution from Significant Non-Scheduled Generation: see definitions at https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/data-nem/operational-demand-data .
Manager NEM Real Time Operations
Cancellation of Forecast Minimum System Load (MSL) MSL1 event in the VIC Region on 14/03/2026.
Cancellation of Forecast Minimum System Load (MSL) MSL1 event in the VIC Region on 14/03/2026.
Cancellation - Forecast MSL1- VIC Region at 1120 hrs 14/03/2026.
Refer to Market Notice 134799 for MSL1.
Manager NEM Real Time Operations
Forecast Minimum System Load MSL1 condition in the VIC Region on 14/03/2026
Forecast Minimum System Load MSL1 condition in the VIC Region on 14/03/2026
AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the VIC on 14/03/2026.
Minimum System Load (MSL) conditions are forecast when demand is less than the relevant MSL threshold. The advisory MSL thresholds are:
- MSL1: 1905 MW
- MSL2: 1405 MW
- MSL3: 905 MW
The demand is forecast to be below the MSL1 threshold for the following period[s]:
- From 1200 hrs 14/03/2026 to 1300 hrs 14/03/2026. Minimum demand is forecast to be 1859 MW at 1300 hrs.
Forecast demand refers to forecast Operational Demand that excludes contribution from Significant Non-Scheduled Generation: see definitions at https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/data-nem/operational-demand-data.
Manager NEM Real Time Operations
Forecast Minimum System Load (MSL1) condition in the SA Region on 14/03/2026
AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the SA region on 14/03/2026.
Minimum System Load (MSL) conditions are forecast when demand is less than the relevant MSL threshold. The advisory MSL thresholds are:
- MSL1: 34 MW
- MSL2: -117 MW
- MSL3: -468 MW
The demand is forecast to be below the MSL1 threshold for the following period:
From 1230 hrs 14/03/2026 to 1330 hrs 14/03/2026. Minimum demand is forecast to be 21 MW at 1330 hrs.
Forecast demand refers to forecast Operational Demand that excludes contribution from Significant Non-Scheduled Generation: see definitions at https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/data-nem/operational-demand-data .
AEMO Operations