STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 30/01/2026
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:
[1.] From 2000 hrs 30/01/2026 to 2030 hrs 30/01/2026.
The forecast capacity reserve requirement is 594 MW.
The minimum capacity reserve available is 570 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 30/01/2026
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 133151 is cancelled at 1730 hrs 28/01/2026.
No LOR condition is currently forecast in the STPASA period.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 30/01/2026
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 133150 has been updated to the following:
From 1930 hrs 30/01/2026 to 2030 hrs 30/01/2026.
The forecast capacity reserve requirement is 610 MW.
The minimum capacity reserve available is 607 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 30/01/2026
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 133148 has been updated to the following:
[1.] From 1730 hrs 30/01/2026 to 1800 hrs 30/01/2026.
The forecast capacity reserve requirement is 496 MW.
The minimum capacity reserve available is 495 MW.
[2.] From 1900 hrs 30/01/2026 to 2100 hrs 30/01/2026.
The forecast capacity reserve requirement is 588 MW.
The minimum capacity reserve available is 559 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 30/01/2026
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:
[1.] From 2000 hrs 30/01/2026 to 2100 hrs 30/01/2026.
The forecast capacity reserve requirement is 646 MW.
The minimum capacity reserve available is 614 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
AEMO Operations
Cancellation of Actual (LOR1) condition in the SA region - 26/01/2026
Cancellation of Actual (LOR1) condition in the SA region - 26/01/2026
The Actual LOR1 Condition in the SA Region advised in AEMO Electricity Market Notice No.133105 is cancelled at 2145 hrs 26/01/2026.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the SA region - 26/01/2026
Actual Lack Of Reserve Level 1 (LOR1) in the SA region - 26/01/2026
An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the SA region from 2030 hrs.
The Actual LOR1 condition is forecast to exist until 26/01/2026 2200 hrs
The capacity reserve requirement is 654 MW
The minimum capacity reserve available is 447 MW
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 26/01/2026
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following Period:
[1.] From 2100 hrs 26/01/2026 to 2130 hrs 26/01/2026.
The forecast capacity reserve requirement is 651 MW.
The minimum capacity reserve available is 538 MW.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 26/01/2026
The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 133093 is cancelled at 1545 hrs 26/01/2026.
Manager NEM Real Time Operations