134799MINIMUM SYSTEM LOAD14/03/2026 08:14:33 AM

Forecast Minimum System Load MSL1 condition in the VIC Region on 14/03/2026

AEMO ELECTRICITY MARKET NOTICE
Forecast Minimum System Load MSL1 condition in the VIC Region on 14/03/2026

AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the VIC on 14/03/2026.

Minimum System Load (MSL) conditions are forecast when demand is less than the relevant MSL threshold. The advisory MSL thresholds are:
- MSL1: 1905 MW
- MSL2: 1405 MW
- MSL3: 905 MW

The demand is forecast to be below the MSL1 threshold for the following period[s]:
- From 1200 hrs 14/03/2026 to 1300 hrs 14/03/2026. Minimum demand is forecast to be 1859 MW at 1300 hrs.


Forecast demand refers to forecast Operational Demand that excludes contribution from Significant Non-Scheduled Generation: see definitions at https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/data-nem/operational-demand-data.

Manager NEM Real Time Operations
134767MINIMUM SYSTEM LOAD13/03/2026 10:43:18 AM

Forecast Minimum System Load (MSL1) condition in the SA Region on 14/03/2026

AEMO ELECTRICITY MARKET NOTICE

AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the SA region on 14/03/2026.

Minimum System Load (MSL) conditions are forecast when demand is less than the relevant MSL threshold. The advisory MSL thresholds are:
- MSL1: 34 MW
- MSL2: -117 MW
- MSL3: -468 MW

The demand is forecast to be below the MSL1 threshold for the following period:
From 1230 hrs 14/03/2026 to 1330 hrs 14/03/2026. Minimum demand is forecast to be 21 MW at 1330 hrs.

Forecast demand refers to forecast Operational Demand that excludes contribution from Significant Non-Scheduled Generation: see definitions at https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/data-nem/operational-demand-data .

AEMO Operations
134763MINIMUM SYSTEM LOAD12/03/2026 09:39:12 PM

Cancellation of Forecast Minimum System Load (MSL) MSL1 event in the SA Region on 13/03/2026.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Forecast Minimum System Load (MSL) MSL1 event in the SA Region on 13/03/2026.

Cancellation - Forecast MSL1 - SA Region at 2140 hrs 12/03/2026.

Refer to Market Notice 134762 for MSL1.

Manager NEM Real Time Operations
134762MINIMUM SYSTEM LOAD12/03/2026 08:24:16 PM

Forecast Minimum System Load MSL1 condition in the SA Region on 13/03/2026

AEMO ELECTRICITY MARKET NOTICE
Forecast Minimum System Load MSL1 condition in the SA Region on 13/03/2026

AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the SA on 13/03/2026.

Minimum System Load (MSL) conditions are forecast when demand is less than the relevant MSL threshold. The advisory MSL thresholds are:
- MSL1 = 122 MW
- MSL2 = -104 MW
- MSL3 = -468 MW

The demand is forecast to be below the MSL1 threshold for the following period[s]:
- From 1300 hrs 13/03/2026 to 1330 hrs 13/03/2026. Minimum demand is forecast to be 100 MW at 1330 hrs.

Forecast demand refers to forecast Operational Demand that excludes contribution from Significant Non-Scheduled Generation: see definitions at https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/data-nem/operational-demand-data .

Manager NEM Real Time Operations
134666MINIMUM SYSTEM LOAD09/03/2026 02:01:37 PM

Cancellation of Forecast Minimum System Load (MSL) MSL2 event in the SA Region on 09/03/2026.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Forecast Minimum System Load (MSL) MSL2 event in the SA Region on 09/03/2026.

Cancellation - Forecast MSL2- SA Region at 1400 hrs 09/03/2026.

Refer to Market Notice 134656 for MSL2.

Manager NEM Real Time Operations
134664MINIMUM SYSTEM LOAD09/03/2026 03:05:09 PM

Cancellation of Actual Minimum System Load (MSL) MSL1 event in the SA Region on 09/03/2026.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual Minimum System Load (MSL) MSL1 event in the SA Region on 09/03/2026.

Cancellation - Actual MSL1- SA Region at 1500 hrs 09/03/2026.

Refer to Market Notice 134663 for MSL1.

Manager NEM Real Time Operations
134663MINIMUM SYSTEM LOAD09/03/2026 11:44:23 AM

Actual Minimum System Load MSL1 condition in the SA Region on 09/03/2026

AEMO ELECTRICITY MARKET NOTICE
Actual Minimum System Load MSL1 condition in the SA Region on 09/03/2026

AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the SA on 09/03/2026.

The advisory MSL thresholds are:
- MSL1: 34 MW
- MSL2: -117 MW
- MSL3: -468 MW

The demand is below the MSL1 threshold.

Demand refers to Operational Demand that excludes contribution from Significant Non-Scheduled Generation: see definitions at https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/data-nem/operational-demand-data .



Manager NEM Real Time Operations
134661MINIMUM SYSTEM LOAD09/03/2026 12:39:55 PM

Cancellation of Forecast Minimum System Load (MSL1) condition in the VIC Region on 14/03/2026

AEMO ELECTRICITY MARKET NOTICE

Cancellation - Forecast MSL1 - VIC Region at 1200 hrs 09/03/2026.

Refer to Market Notice 134649 for MSL1.

AEMO Operations
134656MINIMUM SYSTEM LOAD09/03/2026 04:37:21 AM

Forecast Minimum System Load MSL2 condition in the SA Region on 09/03/2026

AEMO ELECTRICITY MARKET NOTICE
Forecast Minimum System Load MSL2 condition in the SA Region on 09/03/2026

AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the SA on 09/03/2026.


Minimum System Load (MSL) conditions are forecast when demand is less than the relevant MSL threshold. The advisory MSL thresholds are:
- MSL1: 34 MW
- MSL2: -117 MW
- MSL3: -468 MW

The demand is forecast to be below the MSL2 threshold for the following period[s]:
(1) From 1230 hrs 09/03/2026 to 1400 hrs 09/03/2026. Minimum demand is forecast to be -144 MW at 1330 hrs.

Forecast demand refers to forecast Operational Demand that excludes contribution from Significant Non-Scheduled Generation: see definitions at https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/data-nem/operational-demand-data .

AEMO is seeking a market response.
AEMO estimates the latest time at which it may need to intervene through an AEMO intervention event is 0700 hrs on 09/03/2026.

Manager NEM Real Time Operations