Network Augmentation Commissioned - NSW Region - 20/03/2026
A network augmentation has been commissioned in the NSW region at 1052 hrs 20/03/2026 as follows:
Eraring - Eraring BESS No.2P 330 kV Transmission Line
Manager NEM Real Time Operations
[EventId:202603131700_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 13 March 2026 17:00
Issued by Australian Energy Market Operator Ltd at 1700 hrs on 13 March 2026
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 13 March 2026.
Refer to market notice: 134782
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 1700 hrs on 13 March 2026.
This is an AEMO autogenerated Market Notice.
[EventId:202603131605_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 13 March 2026 16:05
Issued by Australian Energy Market Operator Ltd at 1605 hrs on 13 March 2026
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 13 March 2026.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1605 hrs on 13 March 2026.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202603131345_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 13 March 2026 13:45
Issued by Australian Energy Market Operator Ltd at 1345 hrs on 13 March 2026
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 13 March 2026.
Refer to market notice: 134777
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 1345 hrs on 13 March 2026.
This is an AEMO autogenerated Market Notice.
[EventId:202603131330_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 13 March 2026 13:30
Issued by Australian Energy Market Operator Ltd at 1330 hrs on 13 March 2026
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 13 March 2026.
Refer to market notice: 134774
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1330 hrs on 13 March 2026.
This is an AEMO autogenerated Market Notice.
[EventId:202603131315_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 13 March 2026 13:15
Issued by Australian Energy Market Operator Ltd at 1315 hrs on 13 March 2026
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 13 March 2026.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1315 hrs on 13 March 2026.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202603131300_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 13 March 2026 13:00
Issued by Australian Energy Market Operator Ltd at 1300 hrs on 13 March 2026
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 13 March 2026.
Refer to market notice: 134771
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 1300 hrs on 13 March 2026.
This is an AEMO autogenerated Market Notice.
[EventId:202603131235_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 13 March 2026 12:35
Issued by Australian Energy Market Operator Ltd at 1235 hrs on 13 March 2026
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 13 March 2026.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1235 hrs on 13 March 2026.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202603131205_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 13 March 2026 12:05
Issued by Australian Energy Market Operator Ltd at 1205 hrs on 13 March 2026
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 13 March 2026.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1205 hrs on 13 March 2026.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.