Market Notices

144143RECLASSIFY CONTINGENCY25/05/2026 08:55:51 PM

Reclassification of a Non-Credible Contingency Event: Penola West - South East 1 132kV line and Kincraig - Penola West 1 132kV line in SA1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: SA1

Lines: Penola West - South East 1 132kV and Kincraig - Penola West 1 132kV

Duration: 25/05/2026 20:55 until further notice

Constraint set(s) invoked:
NONE

Auto-generated on behalf of Manager NEM Real Time Operations
     
144125RECLASSIFY CONTINGENCY20/05/2026 10:44:50 PM

Cancellation of a Non-Credible Contingency Event: Mudgeeraba - Terranora No.757 110 kV line and Mudgeeraba - Terranora No.758 110 kV line in QLD1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: QLD1

Lines: Mudgeeraba - Terranora No.757 110 kV and Mudgeeraba - Terranora No.758 110 kV

Cancellation time: 20/05/2026 22:44

Constraint set(s) revoked:
NONE

Refer AEMO Electricity Market Notice 144123

Auto-generated on behalf of Manager NEM Real Time Operations
     
144123RECLASSIFY CONTINGENCY20/05/2026 08:39:25 PM

Reclassification of a Non-Credible Contingency Event: Mudgeeraba - Terranora No.757 110 kV line and Mudgeeraba - Terranora No.758 110 kV line in QLD1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: QLD1

Lines: Mudgeeraba - Terranora No.757 110 kV and Mudgeeraba - Terranora No.758 110 kV

Duration: 20/05/2026 20:39 until further notice

Constraint set(s) invoked:
NONE

Auto-generated on behalf of Manager NEM Real Time Operations
     
144107RESERVE NOTICE17/05/2026 02:14:43 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 17/05/2026

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 144106 is cancelled at 1400 hrs 17/05/2026.

Manager NEM Real Time Operations
     
144106RESERVE NOTICE17/05/2026 01:28:35 PM

PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 18/05/2026

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:


[1.] From 1700 hrs 18/05/2026 to 1900 hrs 18/05/2026.
The forecast capacity reserve requirement is 759 MW.
The minimum capacity reserve available is 357 MW.


AEMO is seeking a market response.

AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.


Manager NEM Real Time Operations
     
144103RESERVE NOTICE17/05/2026 10:41:04 AM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 19/05/2026

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 144093 is cancelled at 1030 hrs 17/05/2026.

Manager NEM Real Time Operations
     
144099RECLASSIFY CONTINGENCY16/05/2026 11:02:13 PM

Cancellation of the reclassification of a Non-Credible Contingency Event: Para-Templers West and Magill-Torrens Island A 275kV lines in SA due to severe weather warning.

AEMO ELECTRICITY MARKET NOTICE.

Cancellation of the reclassification of a non-credible contingency event as a credible contingency event due to severe weather warning.
AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any severe weather warning in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: SA
Lines: Para-Templers West and Magill-Torrens Island A 275kV lines
Cancellation time: 2300 hrs 16/05/2026
Constraint set(s) revoked: Nil
Refer AEMO Electricity Market Notice 144096

Manager NEM Real Time Operations
     
144098RECLASSIFY CONTINGENCY16/05/2026 11:02:03 PM

Cancellation of the reclassification of a Non-Credible Contingency Event: Brinkworth-Davenport, Brinkworth-Templers West and Para-Templers West 275kV lines in SA due to severe weather warning .

AEMO ELECTRICITY MARKET NOTICE.

Cancellation of the reclassification of a non-credible contingency event as a credible contingency event due to severe weather warning.
AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any severe weather warning in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: SA
Lines: Brinkworth-Davenport, Brinkworth-Templers West and Para-Templers West 275kV lines
Cancellation time: 2300 hrs 16/05/2026
Constraint set(s) revoked: Nil
Refer AEMO Electricity Market Notice 144095

Manager NEM Real Time Operations
     
144096RECLASSIFY CONTINGENCY16/05/2026 07:21:07 PM

Reclassification of a Non-Credible Contingency Event: Para-Templers West and Magill-Torrens Island A 275kV lines in SA due to severe weather warning.

AEMO ELECTRICITY MARKET NOTICE.

Reclassification of a non-credible contingency event as a credible contingency event due to severe weather warning.
AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: SA
Lines: Para-Templers West and Magill-Torrens Island A 275kV lines
Duration: 1920 hrs 16/05/2026 until further notice
Constraint set(s) invoked: Nil

Manager NEM Real Time Operations
     