131467SETTLEMENTS RESIDUE07/12/2025 09:35:30 AM

[EventId:202512070935_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 07 December 2025 09:35

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0935 hrs on 7 December 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 7 December 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.

The negative residue constraint set NRM_VIC1_SA1 commenced operating from 0935 hrs on 7 December 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
131457RESERVE NOTICE06/12/2025 09:14:29 PM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 09/12/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:

[1.] From 1630 hrs 09/12/2025 to 1900 hrs 09/12/2025.
The forecast capacity reserve requirement is 1139 MW.
The minimum capacity reserve available is 960 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
131428RESERVE NOTICE06/12/2025 12:06:59 AM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 06/12/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 131427 is cancelled at 0000 hrs 06/12/2025.

Manager NEM Real Time Operations
131427RESERVE NOTICE05/12/2025 08:44:28 PM

PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 06/12/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:


[1.] From 1700 hrs 06/12/2025 to 1900 hrs 06/12/2025.
The forecast capacity reserve requirement is 847 MW.
The minimum capacity reserve available is 770 MW.


AEMO is seeking a market response.

AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
131422RESERVE NOTICE05/12/2025 06:44:48 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 06/12/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 131404 is cancelled at 1845 hrs 05/12/2025.

Manager NEM Real Time Operations
131420SETTLEMENTS RESIDUE05/12/2025 06:30:25 PM

[EventId:202512051830_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 05 December 2025 18:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1830 hrs on 5 December 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 5 December 2025.

Refer to market notice: 131419

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1830 hrs on 5 December 2025.

This is an AEMO autogenerated Market Notice.
131419SETTLEMENTS RESIDUE05/12/2025 06:00:40 PM

[EventId:202512051800_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 05 December 2025 18:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1800 hrs on 5 December 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 5 December 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1800 hrs on 5 December 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
131418SETTLEMENTS RESIDUE05/12/2025 05:45:31 PM

[EventId:202512051745_NRM_NSW1_QLD1_stopped] NEGRES CONSTRAINT NRM_NSW1_QLD1 ceased operating from 05 December 2025 17:45

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1745 hrs on 5 December 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to QLD - 5 December 2025.

Refer to market notice: 131416

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to QLD directional interconnector.

The negative residue constraint NRM_NSW1_QLD1 ceased operating at 1745 hrs on 5 December 2025.

This is an AEMO autogenerated Market Notice.
131417SETTLEMENTS RESIDUE05/12/2025 05:30:33 PM

[EventId:202512051730_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 05 December 2025 17:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1730 hrs on 5 December 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 5 December 2025.

Refer to market notice: 131413

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1730 hrs on 5 December 2025.