Direction - SA region to AGL SA Generation Pty Limited - BARKER INLET PS
Direction - SA region to AGL SA Generation Pty Limited - BARKER INLET PS
In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to AGL SA Generation Pty Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
Direction issued to: AGL SA Generation Pty Limited - BARKER INLET PS at 1210 hrs 18/11/2025
Type of resource: generating unit
Required actions: Synchronise and follow dispatch targets at 1210 hrs 18/11/2025
Services provided: Voltage Control
Circumstances necessitating the Direction:Voltage
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state
Expected duration: 1400 hrs 18/11/2025
AGL SA Generation Pty Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - South Pine 7 transformer - QLD region - 17/11/2025
Inter-regional transfer limit variation - South Pine 7 transformer - QLD region - 17/11/2025
At 1853 hrs 17/11/2025 there was an unplanned outage of South Pine 7 transformer.
The following constraint set(s) invoked at 1915 hrs 17/11/2025:
CA_BRIS_582D74B3
This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1
NSW1-QLD1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Rye Park to Yass (3J) 330kV line - NSW region - 16/11/2025
Inter-regional transfer limit variation - Rye Park to Yass (3J) 330kV line - NSW region - 16/11/2025
A planned outage of Rye Park to Yass (3J) 330kV line in the NSW region was scheduled from 1100 hrs 16/11/2025 to 1500 hrs 16/11/2025.
The outage has been completed and Rye Park to Yass (3J) 330kV line returned to service at 1125 hrs 16/11/2025
Constraint set(s) revoked: N-GRYS_3J_15M
Manager NEM Real Time Operations
Cancellation - AEMO Intervention Event - SA region 15/11/2025
Cancellation - AEMO Intervention Event - SA region 15/11/2025
Refer to Market Notice 130646
The AEMO Intervention Event and all associated directions are cancelled from 1245hrs on 15/11/2025.
Manager NEM Real Time Operations
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRENS IS BESS
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRENS IS BESS
Refer to Market Notice 130645
Direction is cancelled from: 1245 hrs 15/11/2025
Manager NEM Real Time Operations
Direction - SA region 15/11/2025
Direction - SA region 15/11/2025
In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
The issue of the direction commences an AEMO intervention event. AEMO declares all trading intervals during the event to be intervention trading intervals, commencing from the interval ending 0905 hrs on 15/11/2025.
Intervention pricing does not apply to this AEMO intervention event.
AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.
Manager NEM Real Time Operations
Direction - SA region 15/11/2025
Direction - SA region 15/11/2025
Refer to Market Notice 130643
In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to the participants specified below. For the purposes of the National Electricity Rules these are directions under clause 4.8.9(a1)(1).
Directions issued to:
AGL SA Generation Pty Limited - TORRENS ISLAND BESS
Required actions: remain synchronised and follow dispatch targets at 0900 hrs 15/11/2025
These directions are issued at 0900 hrs 15/11/2025
Type of resource: bi-directional unit
Services provided: Minimum System Load Management
Circumstances necessitating the direction: AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state
Expected duration: 1430 hrs 15/11/2025
No participant specified in this direction incurs any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Armidale to Dumaresq 8C 330kV line - NSW region - 14/11/2025
Inter-regional transfer limit variation - Armidale to Dumaresq 8C 330kV line - NSW region - 14/11/2025
A planned outage of Armidale to Dumaresq 8C 330kV line in the NSW region was scheduled from 0800 hrs 14/11/2025 to 1500 hrs 14/11/2025.
The outage has been completed and Armidale to Dumaresq 8C 330kV line returned to service at 1220 hrs 14/11/2025
Constraint sets revoked:
N-ARDM_8C
N-DM_SVC
N-TW_SVC
N-X_8C+DM+TW_SVC
Manager NEM Real Time Operations
Inter-Regional Transfer limit variation - Murraylink
Inter-Regional Transfer limit variation - Murraylink
There has been an unplanned outage of the Murraylink interconnector.
The following constraint set was invoked at 0805 hrs 13/11/2025
I-ML_ZERO
The constraint set contains the following interconnector on the left hand side.
V-S-MNSP1,VIC1-NSW1
Refer to AEMO Network Outage Scheduler (NOS) for further details.
Manager NEM Real Time Operations