[EventId:202604031205_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 03 April 2026 12:05
Issued by Australian Energy Market Operator Ltd at 1205 hrs on 3 April 2026
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 3 April 2026.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1205 hrs on 3 April 2026.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202603311530_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 31 March 2026 15:30
Issued by Australian Energy Market Operator Ltd at 1530 hrs on 31 March 2026
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 31 March 2026.
Refer to market notice: 139192
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 1530 hrs on 31 March 2026.
This is an AEMO autogenerated Market Notice.
[EventId:202603311240_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 31 March 2026 12:40
Issued by Australian Energy Market Operator Ltd at 1240 hrs on 31 March 2026
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 31 March 2026.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1240 hrs on 31 March 2026.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202603311230_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 31 March 2026 12:30
Issued by Australian Energy Market Operator Ltd at 1230 hrs on 31 March 2026
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 31 March 2026.
Refer to market notice: 139190
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 1230 hrs on 31 March 2026.
This is an AEMO autogenerated Market Notice.
[EventId:202603311135_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 31 March 2026 11:35
Issued by Australian Energy Market Operator Ltd at 1135 hrs on 31 March 2026
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 31 March 2026.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1135 hrs on 31 March 2026.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202603271230_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 27 March 2026 12:30
Issued by Australian Energy Market Operator Ltd at 1230 hrs on 27 March 2026
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 27 March 2026.
Refer to market notice: 137463
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 1230 hrs on 27 March 2026.
This is an AEMO autogenerated Market Notice.
[EventId:202603271105_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 27 March 2026 11:05
Issued by Australian Energy Market Operator Ltd at 1105 hrs on 27 March 2026
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 27 March 2026.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1105 hrs on 27 March 2026.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202603270900_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 27 March 2026 09:00
Issued by Australian Energy Market Operator Ltd at 0900 hrs on 27 March 2026
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 27 March 2026.
Refer to market notice: 137404
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 0900 hrs on 27 March 2026.
This is an AEMO autogenerated Market Notice.
[EventId:202603270810_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 27 March 2026 08:10
Issued by Australian Energy Market Operator Ltd at 0810 hrs on 27 March 2026
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 27 March 2026.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 0810 hrs on 27 March 2026.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.