STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 10/06/2026
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 144205 has been updated to the following:
[1.] From 0830 hrs 10/06/2026 to 1700 hrs 10/06/2026.
The forecast capacity reserve requirement is 571 MW.
The minimum capacity reserve available is 384 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 10/06/2026
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following period:
[1.] From 0800 hrs 10/06/2026 to 1000 hrs 10/06/2026.
The forecast capacity reserve requirement is 744 MW.
The minimum capacity reserve available is 542 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Koorangie to Wemen 220 kV Line - VIC region - 05/06/2026
Inter-regional transfer limit variation - Koorangie to Wemen 220 kV Line - VIC region - 05/06/2026
A planned outage of Koorangie to Wemen 220 kV Line in the VIC region was scheduled from 1130 hrs 25/05/2026 to 1700 hrs 08/06/2026.
The outage has been completed and Koorangie to Wemen 220 kV Line returned to service at 1920 hrs 05/06/2026
Constraint set(s) revoked: V-KOWE
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Directlink - NSW region
Inter-regional transfer limit variation - Directlink No. 3 Leg - NSW region - 05/06/2026
A planned outage of Directlink No. 3 Leg in the NSW region was scheduled from 0700 hrs 01/06/2026 to 1600 hrs 08/06/2026.
The outage has been completed and Directlink No. 3 Leg returned to service at 1150 hrs 05/05/2026
Constraint set(s) revoked: N-MBTE_1
Manager NEM Real Time Operations
Update - Non-credible contingency event - QLD region - 29/05/2026
Update - Non-credible contingency event - QLD region - 29/05/2026
Refer AEMO Electricity Market Notice 144162
At 2135 hrs the Woolooga to Teebar Creek 8850 275kV Line and the Teebar Ck No2 275kV Bus was returned to service.
The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this event as a credible contingency event.
Manager NEM Real Time Operations
Non-credible contingency event - QLD region - 29/05/2026
Non-credible contingency event - QLD region - 29/05/2026
At 1013 hrs the Woolooga to Teebar Creek 8850 275kV Line and the Teebar Ck No2 275kV Bus tripped.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Heywood M1 500/275kV XFMR - VIC region - 29/05/2026
Inter-regional transfer limit variation - Heywood M1 500/275kV XFMR - VIC region - 29/05/2026
A planned outage of Heywood M1 500/275kV XFMR in the VIC region was scheduled from 1100 hrs 25/05/2026 to 1800 hrs 29/05/2026.
The outage has been completed and Heywood M1 500/275kV XFMR returned to service at 0920 hrs 29/05/2026
Constraint set(s) revoked: V-HYTX_M12
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Koorangie to Wemen 220 kV Line - VIC region - 25/05/2026
Inter-regional transfer limit variation - Koorangie to Wemen 220 kV Line - VIC region - 25/05/2026
At 1130 hrs 25/05/2026 there was a short notice outage of Koorangie to Wemen 220 kV Line.
The following constraint set(s) invoked at 1130 hrs 25/05/2026
V-KOWE
This constraint set(s) contains equations with the following interconnectors on the LHS.
V-S-MNSP1,T-V-MNSP1,V-SA,VIC1-NSW1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Tailem Bend 275 kV East Bus - SA region - 24/05/2026
Inter-regional transfer limit variation - Tailem Bend 275 kV East Bus - SA region - 24/05/2026
At 1250 hrs 24/05/2026 there was a short notice outage of Tailem Bend 275 kV East Bus.
The following constraint set(s) invoked at 1250 hrs 24/05/2026
S-TB275_E_BUS
This constraint set(s) contains equations with the following interconnectors on the LHS.
V-SA
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations