Market Notices

130801RECLASSIFY CONTINGENCY19/11/2025 09:04:04 PM

Cancellation of a Non-Credible Contingency Event: Gordon - Chapel St No 1 220kV line and Gordon - Chapel St No 2 220kV line in TAS1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: TAS1

Lines: Gordon - Chapel St No 1 220kV and Gordon - Chapel St No 2 220kV

Cancellation time: 19/11/2025 21:03

Constraint set(s) revoked:
F-T-CSGO Constraint set contains the following interconnector(s) on the left hand side:
T-V-MNSP1
T-CSGO_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NONE


Refer AEMO Electricity Market Notice 130797

Auto-generated on behalf of Manager NEM Real Time Operations
130800PRICES UNCHANGED19/11/2025 08:38:07 PM

[EventId:202511192040_confirmed] Prices for interval 19-Nov-2025 20:40 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 2038 hrs on 19 November 2025

PRICES ARE NOW CONFIRMED for trading interval 19-Nov-2025 20:40.

In accordance with Market Notice 130799 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
130799PRICES SUBJECT TO REVIEW19/11/2025 08:35:18 PM

[EventId:202511192040_review] Prices for interval 19-Nov-2025 20:40 are subject to review

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 2035 hrs on 19 November 2025

PRICES ARE SUBJECT TO REVIEW for trading interval 19-Nov-2025 20:40.

AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs


This is an AEMO autogenerated Market Notice.
130798RESERVE NOTICE19/11/2025 08:21:07 PM

Cancellation of Actual (LOR1) condition in the NSW region - 19/11/2025

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the NSW region - 19/11/2025

The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No.130795 is cancelled at 2010 hrs 19/11/2025.

Manager NEM Real Time Operations
130797RECLASSIFY CONTINGENCY19/11/2025 08:03:10 PM

Reclassification of a Non-Credible Contingency Event: Gordon - Chapel St No 1 220kV line and Gordon - Chapel St No 2 220kV line in TAS1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: TAS1

Lines: Gordon - Chapel St No 1 220kV and Gordon - Chapel St No 2 220kV

Duration: 19/11/2025 20:03 until further notice

Constraint set(s) invoked:
F-T-CSGO Constraint set contains the following interconnector(s) on the left hand side:
T-V-MNSP1
T-CSGO_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NONE


Auto-generated on behalf of Manager NEM Real Time Operations
130796SETTLEMENTS RESIDUE19/11/2025 07:30:27 PM

[EventId:202511191930_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 19 November 2025 19:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1930 hrs on 19 November 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 19 November 2025.

Refer to market notice: 130794

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1930 hrs on 19 November 2025.

This is an AEMO autogenerated Market Notice.
130795RESERVE NOTICE19/11/2025 06:09:54 PM

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 19/11/2025

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 19/11/2025

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1800 hrs.
The Actual LOR1 condition is forecast to exist until 19/11/2025 2000 hrs

The capacity reserve requirement is 1615 MW
The minimum capacity reserve available is 1096 MW

Manager NEM Real Time Operations
130794SETTLEMENTS RESIDUE19/11/2025 04:55:34 PM

[EventId:202511191655_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 19 November 2025 16:55

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1655 hrs on 19 November 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 19 November 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1655 hrs on 19 November 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
130793RECLASSIFY CONTINGENCY19/11/2025 04:39:01 PM

Cancellation of a Non-Credible Contingency Event: Collinsville North - Proserpine No.7125 132 kV line and Collinsville North - Proserpine No.7126 132 kV line in QLD1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: QLD1

Lines: Collinsville North - Proserpine No.7125 132 kV and Collinsville North - Proserpine No.7126 132 kV

Cancellation time: 19/11/2025 16:38

Constraint set(s) revoked:
NONE

Refer AEMO Electricity Market Notice 130788

Auto-generated on behalf of Manager NEM Real Time Operations