Current versions of the Wholesale Electricity Market (WEM) market procedures can be found on this page. Administrative market procedures Name Description Head of po...
-
Search results for "scada"
-
Filters
-
RESULTS
-
-
-
Updated 20 Apr 2018
-
-
-
-
-
Updated 20 Mar 2018
-
Interim arrangements - Utility Scale Battery Technology
This is aguidance document for industry, describing interim arrangements to apply in a number of key areas including: registration, metering, SCADA, negotiation of generator performance standards (GPS) and engagement with NSPs. FAQ Interim arrangements - Utility Scale Battery...
-
-
-
-
-
Updated 02 Mar 2018
-
Stage 5 - Construction
The Connection Applicant will undertake detailed design work and construct or modify their facility. Any augmentation to the Declared Shared Network (DSN) will be designed and constructed by: The selected Declared Transmission System Operator (DTSO) for the contestable portio...
-
-
-
-
-
Updated 02 Mar 2018
-
Stage 5 - Construction
The Connection Applicant will undertake detailed design work and will construct/modify their facility. During construction, and prior to applying for registration, the Connection Applicant must finalise and forward to the connecting Network Service Provider (NSP) and AEMO: Tec...
-
-
-
-
-
Updated 01 Mar 2018
-
System Management reports
Under the Market Rules, System Management provides various reports and information to the IMO and AEMO. Reports and information that are published by AEMO are available below. Status reports Under the Market Rules, System Management must provide a report once every three months...
-
-
-
-
-
Updated 24 Jan 2018
-
Stage 6 - Completion
If they havent already done so, Connection Applicants should submit an application for registration to AEMO. The registration process is separate to the connection process and must be completed prior to commissioning, so Connection Applicants are encouraged to consider registration...
-
-
-
-
-
Updated 24 Jan 2018
-
Stage 6 - Completion
If they havent already done so, Connection Applicants should submit an application for registration to AEMO. The registration process is separate to the connection process and must be completed before commissioning. To assist with the registration process, Connection Applicants sho...
-
-
-
-
-
Updated 15 Jan 2018
-
Generation and Load
Data is provided in comma delimited flat file format to enable access to a range of market data. Recent files are stored in a directory for current reports, and older files are moved into the archive reportsdirectory. Actual Generation and Load Data Actual generation and load data-...
-
-
-
-
-
Updated 31 Aug 2017
-
Energy Conversion Model (ECM) Guidelines Consultation – Wind and Solar Farms
AEMO is conducting a consultation on an amendment to the Energy Conversion Model (ECM) Guidelines. The Energy Conversion Model (ECM) for: Wind forecasting outlines the data required to develop forecasting modules for wind farms in the Australian Wind Energy Forecasting System...
-
-
-