[EventId:201606220635_review] Prices for interval 22-Jun-2016 06:35 are subject to review
Issued by Australian Energy Market Operator Ltd at 0630 hrs on 22 June 2016
PRICES ARE SUBJECT TO REVIEW for dispatch interval 22-Jun-2016 06:35.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2(b) of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:201606220630_review] Prices for interval 22-Jun-2016 06:30 are subject to review
Issued by Australian Energy Market Operator Ltd at 0625 hrs on 22 June 2016
PRICES ARE SUBJECT TO REVIEW for dispatch interval 22-Jun-2016 06:30.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2(b) of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
Inter-Regional Transfer limit variation: Basslink
Inter-Regional Transfer limit variation: Basslink
At 0614 hrs Wednesday, 22 June 2016 the Basslink interconnector tripped.
Constraint set I-BL_ZERO invoked at 0625 hrs
This constraint set limits Basslink flow to 0 MW in either direction.
Manager NEM Real Time Operations
NON-CONFORMANCE Region VIC1 Wednesday, 22 June 2016
NON-CONFORMANCE VIC1 Region Wednesday, 22 June 2016
AEMO declared a schedule generating unit non-conforming
Unit: YWPS4
Duration: 22/06/2016 01:15 to 22/06/2016 02:00
Amount: -29 MW
Constraint: NC-V_YWPS4
Auto-generated on behalf of Manager NEM Real Time Operations
Cancellation Inter-Regional Transfer limit variation Terranora - 21 June 2016
Cancellation Inter-Regional Transfer limit variation Terranora - 21 June 2016
Refer AEMO Electricity Market notice - 54001
The power flow on the Terranora interconnector is now following the value determined by the NEM dispatch algorithm.
The Constraint Set I-CTRL_ISSUE_TE has been revoked at 1615 hrs.
This Constraint Set contains an equation with the following interconnector on the LHS.
N-Q-MNSP1
Manager NEM Real Time Operations
RESERVE NOTICE MT PASA PUBLICATION 21 JUNE 2016
The MT PASA RELIABILITY_LRC results published on 21 June 2016 forecast shows low reserve conditions (LRC) in South Australia for Summer 2016-17 and Summer 2017-18. AEMO will continue to monitor the situation and take appropriate actions, if necessary.
The MT PASA results for the next 12 months are summarised at:
http://www.aemo.com.au/Electricity/Data/Forecast-Supply-and-Demand/Medium-Term-Outlook
This notice supersedes Market Notice 53965 published on 14 June 2016.
Please find the following information on some key inputs used in MT PASA:
Static minimum reserve levels (MRLs) have been specified for QLD, NSW and TAS regions as follows:
QLD: 913 MW
NSW: -1564 MW
TAS: 144 MW
The following optimum shared minimum reserve levels between Victoria and South Australia regions have been specified:
VIC Reserve >= 205.00
5.88 * VIC Reserve + SA Reserve >= 1237.88
1.33 * VIC Reserve + SA Reserve >= 228.00
0.43 * VIC Reserve + SA Reserve >= -40.53
0.23 * VIC Reserve + SA Reserve >= -147.55
SA Reserve >= -368.00
In order to remain consistent with the calculation of the minimum reserve levels, the following interconnector headroom constraints (net import/export limit constraints) have also been applied in MT PASA:
QLD: 0 MW of maximum net import into QLD.
NSW: 330 MW of minimum net export from NSW.
VIC: 940MW of maximum net import into VIC.
SA: 0 MW of maximum net import into SA.
Demand Side Participation included in MT PASA are:
Summer: QLD 156 MW, NSW 422 MW, VIC 245 MW, SA 167 MW and TAS 73 MW
Winter: QLD 156 MW, NSW 422 MW, VIC 185 MW, SA 167 MW and TAS 73 MW
Supply Planning
AEMO
Inter-Regional Transfer limit variation Terranora - 21 June 2016
Inter-Regional Transfer limit variation Terranora - 21 June 2016
The power flow on the Terranora interconnector is not following the value determined by the NEM dispatch algorithm.
The Constraint Set I-CTRL_ISSUE_TE has been invoked from 1440 hrs until further notice.
This Constraint Set contains an equation with the following interconnector on the LHS.
N-Q-MNSP1
Manager NEM Real Time Operations
[EventId:201606200705_confirmed] Prices for interval 20-Jun-2016 07:05 are now confirmed
Issued by Australian Energy Market Operator Ltd at 0702 hrs on 20 June 2016
PRICES ARE NOW CONFIRMED for dispatch interval 20-Jun-2016 07:05.
In accordance with Market Notice 53999 AEMO has reviewed this dispatch interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:201606200705_review] Prices for interval 20-Jun-2016 07:05 are subject to review
Issued by Australian Energy Market Operator Ltd at 0700 hrs on 20 June 2016
PRICES ARE SUBJECT TO REVIEW for dispatch interval 20-Jun-2016 07:05.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2(b) of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.