Market Notices

108929POWER SYSTEM EVENTS16/07/2023 04:24:11 PM

Non-credible contingency event - QLD region - 16/07/2023

AEMO ELECTRICITY MARKET NOTICE.

Non-credible contingency event - QLD region - 16/07/2023

At 1557 hrs the H021 Murarrie substation No 1 110 kV bus tripped.

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is not known at this stage.


Manager NEM Real Time Operations
108892POWER SYSTEM EVENTS13/07/2023 04:07:21 AM

Update - Non-credible contingency event - Tenterfield 132 kV line CB 96R2 at Glen Innes - NSW region - 13/07/2023

AEMO ELECTRICITY MARKET NOTICE.

Update - Non-credible contingency event - Tenterfield 132 kV line CB 96R2 at Glen Innes - NSW region - 13/07/2023

Refer AEMO ELECTRICITY MARKET NOTICE 108891

The cause of this non credible contingency event is not known at this stage.

AEMO is not satisfied that this non credible event is unlikely to re-occur.

AEMO has therefore reclassified this event as a credible contingency event until further notice.

Region: NSW

Element: Tenterfield 132 kV line CB 96R2 at Glen Innes
Duration: 0258 hrs 13/07/2023 until further notice
Constraint set(s) invoked: Nil

Manager NEM Real Time Operations
108891POWER SYSTEM EVENTS13/07/2023 03:54:10 AM

Non-credible contingency event - Tenterfield 132 kV line CB 96R2 at Glen Innes - NSW region - 13/07/2023

AEMO ELECTRICITY MARKET NOTICE.

Non-credible contingency event - Tenterfield 132 kV line CB 96R2 at Glen Innes - NSW region - 13/07/2023

At 0258 hrs the Tenterfield 132 kV Line CB 96R2 tripped and auto reclosed.at Glen Innes.

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is not known at this stage.


Manager NEM Real Time Operations
108849POWER SYSTEM EVENTS09/07/2023 03:35:33 PM

Update - Non-credible contingency event - Vic region - 09/07/2023

AEMO ELECTRICITY MARKET NOTICE.

Refer AEMO ELECTRICITY MARKET NOTICE 108846

At 1527 hrs the Mortlake - Blue Gum 500kV Line and Blue Gum to DDWF Line were returned to service.

The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.

AEMO will not reclassify this event as a credible contingency event.

Manager NEM Real Time Operations
108846POWER SYSTEM EVENTS09/07/2023 08:34:15 AM

Non-credible contingency event - Vic region - 09/07/2023

AEMO ELECTRICITY MARKET NOTICE.

Non-credible contingency event - Vic region - 09/07/2023

At 0653 hrs the following elements tripped;
- Mortlake PS - Blue Gum 500 kV Line,
- Blue Gum A1 500/220 kV Transformer
- Dundonnell WF tripped.
- MOPS G11 Trans No2 Bus 500 kV CB tripped

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is not known at this stage.


Manager NEM Real Time Operations
108788POWER SYSTEM EVENTS29/06/2023 08:51:49 PM

Non-credible contingency event - Vic region - 29/06/2023

AEMO ELECTRICITY MARKET NOTICE.

Non-credible contingency event - Vic region - 29/06/2023

At 1454 hrs the Altona - Keilor 220 kV line and the Salt Creek windfarm tripped.

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is not known at this stage.

AEMO is not satisfied that this non credible event is unlikely to re-occur.

AEMO has therefore reclassified this event as a credible contingency event until further notice.

Region: Vic

Duration: 2045 hrs 29/06/2023 until further notice

Constraint set(s) invoked: Nil

Manager NEM Real Time Operations
108414POWER SYSTEM EVENTS08/06/2023 02:56:53 PM

Non-credible contingency event - NSW region - 08/06/2023

AEMO ELECTRICITY MARKET NOTICE.

Non-credible contingency event - NSW region - 08/06/2023

At 1433 hrs the Liddell - Tomago 330 kV 82 line and Liddell 330 kV CB 5412 tripped.

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is not known at this stage.

Manager NEM Real Time Operations
108259POWER SYSTEM EVENTS29/05/2023 10:17:37 AM

Non-credible contingency event - Vic region - 29/05/2023

AEMO ELECTRICITY MARKET NOTICE.

Non-credible contingency event - Vic region - 29/05/2023

At 0941hrs the Moorabool No1 220kV Bus tripped.

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.

AEMO will not reclassify this event as a credible contingency event.

Manager NEM Real Time Operations
108025POWER SYSTEM EVENTS23/05/2023 10:31:42 PM

Non-credible contingency event - Qld region - 23/05/2023

AEMO ELECTRICITY MARKET NOTICE.

Non-credible contingency event - Qld region - 23/05/2023

At 2106 hrs the Kamerunga - Woree 7141 132 kV Line and Barron Gorge 1 and 2 generating units tripped. At 2107 hrs the Kamerunga - Barron Gorge 7143 132 kV Line tripped.

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is not known at this stage.


Manager NEM Real Time Operations
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm