Update - Non-credible contingency event - Qld region - 26/02/2020
Update - Non-credible contingency event - Qld region - 26/02/2020
Refer AEMO Electricity Notice 74494
At 2350 hrs 26/02/2020 the Calvale - Stanwell 8873 and 8874 275 kV Lines tripped and auto reclosed single pole operation.
The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this event as a credible contingency event.
Manager NEM Real Time Operations
Non-credible contingency event - Qld region - 26/02/2020
Non-credible contingency event - Qld region - 26/02/2020
At 2350 hrs the Calvale - Stanwell 8873 and 8874 275 kV Lines tripped and reclosed.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
Non-credible contingency event - NSW Region - 21/02/2020
AEMO ELECTRICITY MARKET NOTICE.
Non-credible contingency event - NSW Region - 21/02/2020
At 1418 hrs the Erarring Unit 3 and at 1419 hrs the Erarring 3A and 3B Generator Transformer tripped.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this event as a credible contingency event.
Manager NEM Real Time Operations
Cancellation :- Vic - SA Separation Event - 31/01/20
Cancellation : - Separation of the Victoria and South Australia Regions - 31/01/2020
Refer AEMO Electricity Markewt Notice No 73172
At 1605 hrs 17/02/2020 the Victoria and South Australia regions were synchronised at Heywood Terminal Station.
Manager NEM Real Time Operations
Update - Non-credible contingency event - NSW region - 17/02/2020
Update - Non-credible contingency event - NSW region - 17/02/2020
Refer AEMO ELECTRICITY MARKET NOTICE 74180
At 0519 hrs the Bayswater - Mt Piper 5A3 and Wollar - Mt Piper 5A5 500 kV Lines tripped and auto reclosed.
The cause of this non credible contingency event has been identified as due to lightning.
AEMO is not satisfied that this non credible event is unlikely to re-occur.
AEMO will therefore reclassify this event as a credible contingency event when lightning is in the vicinity.
Manager NEM Real Time Operations
Non-credible contingency event - NSW region - 17/02/2020
Non-credible contingency event - NSW region - 17/02/2020
At 0519 hrs the Bayswater - Mt Piper 5A3 and Wollar - Mt Piper 5A5 500 kV Lines tripped and auto reclosed.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
Update - Non-credible contingency event - Qld region - 12/02/2020
Update - Non-credible contingency event - Qld region - 12/02/2020
Refer AEMO ELECTRICITY MARKET NOTICE MN 74085
At 1427 hrs 14/02/2020 the Braemar - Kumbarilla Park (8883) 275 kV Line was returned to service.
The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this event as a credible contingency event.
Manager NEM Real Time Operations
Non-credible contingency event - QLD region - 12/02/2020
At 2124 hrs the Braemar - Kumbarilla Park 275 kV 8883 line opened at Kumbarilla Park end only.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
Manager NEM Real Time Operations
Update - Non-credible contingency event - NSW region - 10/02/2020
Update - Non-credible contingency event - NSW region - 10/02/2020
Refer AEMO ELECTRICITY MARKET NOTICE MN 74008
The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this event as a credible contingency event.
Manager NEM Real Time Operations