Filter by category
Filter by Date
Non-credible contingency event - QLD region - 28/02/2021
Non-credible contingency event - QLD region - 28/02/2021
At 0049 hrs 28/02/2021 the Baralaba - Moura 7112 132 kV Transmission line opened at the Baralaba end only.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
Non-credible contingency event - Qld region - 22/02/2021
Non-credible contingency event - Qld region - 22/02/2021
At 2120 hrs the South Pine SVC and the Mount England - Wivenhoe Power Station No 824 275 kV line tripped.
All equipment has been returned to service at 2214 hrs.
The cause of this non credible contingency event has been identified.
AEMO is not satisfied that this non credible event is unlikely to re-occur.
AEMO has therefore reclassified this event as a credible contingency event until further notice.
Manager NEM Real Time Operations
Non-credible contingency event - Qld Region - 05/02/2021
Non-credible contingency event - Qld Region - 05/02/2021
At 0248 hrs the T31 Baralaba Nos 1 and 2 132 kV Buses tripped.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency event is not known at this stage.
Manager NEM Real Time Operations
Update - Non-credible contingency event - SA region - 24/01/2021
Refer Market Notice 82348
Non-credible contingency event - SA region - 24/01/2021
As of 09:55 hrs 26/01/2021 all Lines have been returned to service
Tailem Bend - Cherry Gardens 275 kV Line
Cherry Gardens - Mount Barker South 275 kV Line
Cherry Gardens - Mt Barker 132 kV Line
Constraint Set S-CGTB1 revoked at 0955 hrs 26/01/2021.
The cause of this non credible contingency has been being identified and will not be reclassified as a credible event.
Manager NEM Real Time Operations
Non-credible contingency event - SA region - 24/01/2021
Non-credible contingency event - SA region - 24/01/2021
At 1646 hrs the following Lines tripped in the SA region
Tailem Bend - Cherry Gardens 275 kV Line
Cherry Gardens - Mount Barker South 275 kV Line
Cherry Gardens - Mt Barker 132 kV Line
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
The cause of this non credible contingency has been being identified.
Constraint Set S-CGTB1 invoked from 1655 hrs
Manager NEM Real Time Operations
AEMO SCADA Failure NEM -24/01/2021
Refer AEMO Electricity Market Notice 82330
AEMO SCADA service has been returned to normal in all regions at 1646 hrs.
Manager NEM Real Time Operations
AEMO SCADA Failure NEM -24/01/2021
AEMO is currently experiencing failure of SCADA in all regions.
AEMO is investigating the failure.
Manager NEM Real Time Operations
Update - Non-credible contingency event - QLD region - 22/01/2021
Update - Non-credible contingency event - QLD region - 22/01/2021
Refer AEMO ELECTRICITY MARKET NOTICES 82280 and 82296
At 0255 hrs the Kareeya PS Units 1, 2 and 4 tripped.
Further information on non-credible contingency event has been identified.
Based on the current information AEMO has now reclassified the loss of Kareeya Power Station as a credible contingency event from 0830 hrs until further notice.
Manager NEM Real Time Operations
Update - Non-credible contingency event - Qld region - 22/01/2021
Update - Non-credible contingency event - Qld region - 22/01/2021
Refer AEMO ELECTRICITY MARKET NOTICE 82280
At 0255 hrs the Kareeya PS Units 1, 2 and 4 tripped.
The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this event as a credible contingency event.
Manager NEM Real Time Operations